Audit X-ray Victoria

For contaminated-land consultants and due-diligence teams

What do the EPA audits on and around this site actually say?

Audit X-ray reads the EPA Victoria environmental audits, 53V risk audits and PRSAs on a property and within 500 m, joins them with the Priority Sites Register and GQRUZ, and puts the answer on one screen: conditions, groundwater restrictions, vapour and capping controls, solvent plumes and their sources. Every fact links to the PDF page it came from.

2 to 6 hoursreading audit PDFs for one property today
About 1 hourchecking the linked pages instead

Three example reports

Industrial and commercial sites. The short answer and the ledger come first. Open any audit below them for every extracted fact with its page link. Page chips open the public EPA PDF at that page.

328 Bay Road, Cheltenham VIC 3192

Lot 1 PS802507 · 3,452 m² (Vicmap Property) · data 25 Oct 2026 · not advice

Land Commercial 2 Zone C p.3. Lot 1 of a former chemical storage and handling facility, now a retail store C p.4

Short answer

Chlorinated solvents in groundwater come from this site and extend off site to the south-west C p.9 A p.68. The 2020 statement sets 8 binding conditions: keep the cap, run the EMP and GQMP, do not use groundwater without testing, and do a new audit before any basement C p.8 C p.9.

On this land
  • 0008005833 Statement of environmental audit, 2020. Suitable for commercial and industrial land uses C p.8. 8 binding conditions.
  • The statement says: "Groundwater is polluted with Site-sourced chlorinated hydrocarbons which extend off-Site" C p.9. The plume runs south-west. Its modelled furthest extent is 76 m in about 41 years, measured from a well in the south-west of the site A p.68.
  • The groundwater plan names a possible second solvent source at a well about 100 m south-west, on Wanrua Street C p.87.
  • Groundwater extraction is precluded on site and at least 15 m past the boundary A p.85. EPA declared a GQRUZ in March 2020 A p.67.
  • Fill left on site holds asbestos and benzo(a)pyrene above residential levels; the cover and the EMP manage it A p.66. Soil vapour exceeded residential criteria for cis-1,2-DCE and TCE at one location A p.60.
  • Pages read, 0008005833
    • Part C (statement or summary): 13 of 111 pages read. Read in full: Executive Summary C p.2-6; Statement of Environmental Audit C p.8-10; Attachment 1: Site Location Plan C p.11-12.
    • Part A (audit report): 28 of 207 pages read. Read in full: Executive Summary A p.12-16; Section 7 Impacts of Site Contamination on Protected Beneficial Uses A p.60-65; Section 8 Risk Evaluation and Management A p.66; Section 9 Groundwater Clean Up to the Extent Practicable Assessment A p.67-69; Section 10.6 Auditor's Assessment of Adequacy A p.82; Section 11 Ongoing Management Measures A p.83-84; Section 12 Auditor's Conclusions A p.85-86.
Covers this land
  • 0008002460 Risk audit (s53V, no statement), 2011, of "18-22 Hamlet Street and 322-328 Bay Road" A p.36. 61 recommendations. The site is a source of chlorinated solvents in groundwater, and DNAPL is likely across most of it C p.3 A p.110.
  • Off-site contamination to the south: about 90 m, to at least Phillip Street C p.3; the findings section says up to 150 m C p.8. Vapour risk is potentially unacceptable for the modelled redevelopment scenarios A p.108.
  • Pages read, 0008002460
    • Part C (statement or summary): 18 of 18 pages read (every page). Read in full: Executive Summary C p.2-17; About this Environmental Audit Report / auditor sign-off C p.18.
    • Part A (audit report): 56 of 162 pages read. Read in full: Executive Summary A p.4-20; 1.2 Site Definition A p.31-32; 2.1-2.2 Audit Purpose, CUN requirements and Audit Scope A p.34-36; 6.9 Summary of Auditor's Opinion on Land Contamination A p.94-95; 7.13 Summary of Auditor's Opinion on Groundwater Contamination A p.105; 8 Health Risk Assessment A p.106-109; 9 Audit Findings and 9.7 Approach to Remediation A p.110-122.
Mapped over this land
  • 0008005969 Environmental audit statement, 2024. The register maps it over 99.1% of this parcel. The statement itself names 17 Chandos Street, Lot 2 PS802507 C p.5, and its site plan puts Lot 1 (this parcel) outside the audit site C p.12. So its findings belong to Lot 2, to the south.
  • For Lot 2 it finds a site-sourced TCE plume going off site to the south, predicted to reach 150 to 160 m from the southern boundary in 70 years A p.52. 12 recommendations, including a permanent vapour barrier and no groundwater use C p.9.
  • Pages read, 0008005969
    • Part C (statement or summary): 49 of 968 pages read. Read in full: Environmental audit statement, Sections 1-4 C p.3-10; Statement Attachment 1: Figures C p.11-13; Environmental audit report executive summary appended at end of Part C C p.963-968.
    • Part A (audit report): 31 of 1,038 pages read. Read in full: 3.7 Environmental Auditor conclusion on adequacy of site definition A p.26; 7.3 Environmental Auditor conclusion on QA/QC and reliability of data A p.40; 8.3 Auditor Opinion on Final Site Soil Condition A p.41-42; 9.3 Auditor Opinion on Final Groundwater Condition A p.45-48; 10 Risks to Environmental Values A p.49-51; 11 Auditor determination of clean up so far as reasonably A p.52-54; 12 Audit Conclusions A p.54-57.
Neighbours
  • 0008005308 Statement, 2020, adjoining to the south (Lot 4 PS802507). 5 binding conditions. Chlorinated solvents exceed criteria; the auditor calls them regional C p.10. Its findings belong to that lot.
Priority Sites Register
  • None on the parcel.
  • EAN-00010972 17 Chandos Street, 34 m S: former chemical storage facility, requires ongoing management. Same address as the 2024 statement above.
  • EAN-00010739 332-336 Bay Road, 68 m E of the parcel boundary (EPA register point): former industrial site, requires assessment and/or clean up. It lies up-gradient: the plume from this site runs south-west A p.68. No page read names this address.
GQRUZ
  • Two zones cover the parcel: 7002003 map GQR001315 map. GQR001315 restricts drinking water, irrigation, livestock, industrial and recreational use and water-dependent ecosystems; flow SSW.
  • What the audits add: which contaminants (chlorinated hydrocarbons), that this site is the source, and that the plume leaves the site C p.9.
Within 500 m
  • 15 register items within 500 m, including any on the parcel. 15 read.

    • 9 53X statements
    • 4 53X certificates
    • 1 Audit statement (EP Act 2017)
    • 1 53V risk audit
    • 0 Activity audits (53V)
    • 0 PRSAs
    • 2 Priority Sites Register entries
    • 8 GQRUZ
    RefTypeYearDistanceRelationWhereStatus
    000800583353X statement2020on parcelOn this landthis parcelread
    0008005969Audit statement (EP Act 2017)2024on parcelCovers this landthis parcelread
    000800246053V risk audit2011on parcelCovers this landthis parcelread
    000800530853X statement2020touchingNeighbourHamlet Stread
    000800530753X statement202068 mNearbyHamlet Stread
    000800640253X statement2020127 mNearbyGraham Rdread
    000800082653X statement1999138 mNearbyGraham Rdread
    000800082553X certificate1999143 mNearbyGraham Rdread
    000800013753X certificate1996262 mNearbyMerindah Averead
    000800303953X certificate2020343 mNearbyGraham Rdread
    000800412853X statement2014392 mNearbyJack Rdread
    000800545253X certificate2018448 mNearbyGraham Rdread
    000800610153X statement2021456 mNearbyNepean Hwyread
    000800089253X statement2011456 mNearbyNepean Hwyread
    000800563953X statement2020481 mNearbyGraham Rdread
  • Chlorinated solvents in groundwater also at 0008005307 68 m S C p.11, 0008006402 127 m N C p.4, 0008003039 343 m N A p.47 and 0008004128 392 m S C p.9.
Key obligations
  1. Keep concrete or asphalt cover; 0.5 m clean fill in garden beds C p.8
  2. Reinstate damaged barriers; a 53X audit before removing them C p.8
  3. Implement and maintain the EMP (Attachment 2) C p.8
  4. No groundwater use for precluded uses without testing and review C p.9
  5. Run the GQMP (Attachment 3) until an auditor verifies it is no longer needed and EPA accepts that C p.9
  6. Basement: vapour assessment and a new 53X audit C p.9
  7. Also, under "other related information": give a copy of the statement to any new owner (s53ZE) C p.9

Full read on request: every page of any document, delivered within 24 hours. Pages not listed above were not read.

Per-audit detail (15 audits, nearest first. Open one to see every extracted fact and its page.)

0008005833328 Bay Road CheltenhamOn this land0 m S
  • Register: 53X Statement · 2020-04-09 · 0 m S (audit polygon) · ON PARCEL (overlap 3368.3 m² = 97.6% of parcel, 98.9% of audit area)
  • Document: Statement (EP Act 1970) · dated 9 April 2020 · Parts read: C and A · 8 binding conditions, 0 recommendations
  • Coverage: pages read: 1-10, 92, 103 of 111 (Part C); pages read: 51, 54, 58, 67-68, 78, 101, 185 of 207 (Part A). Pages not listed were not read; findings on them are not reported.
  • Stated site identity: match: stated address 328 Bay Road
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant [groundwater] chlorinated hydrocarbon C p.9; offsite_finding [groundwater] chlorinated hydrocarbon C p.9; plume_extent [groundwater] CHC A p.67; plume_extent [groundwater] CHC A p.51; plume_extent [groundwater] VC A p.68; key_concentration [groundwater] chloroform A p.54; key_concentration [groundwater] trichloroeth A p.54; key_concentration [groundwater] cis-1,2, dichloroethe A p.54
  • Source by contaminant group: nutrients: regional C p.9; metals/metalloids: regional (natural/background) C p.9; asbestos: site C p.3; chlorinated solvents: site C p.9
  • Outcome:
    • Statement of Environmental Audit: site suitable for commercial and industrial land uses subject to conditions C p.8
  • Suitable for:
    • commercial and industrial land uses C p.8
  • Conditions / recommendations:
    • Condition 1: Site must be covered with physical barriers (concrete or asphalt under buildings, carparks, driveways); landscaped areas/garden beds need at least 0.5 m clean fill (IWRG 621 'fill material') C p.8
    • Condition 2: All physical barriers must be maintained and, if damaged or removed during development or occupation, reinstated as soon as possible to the same condition or better C p.8
    • Condition 3: If removal of the physical barriers is proposed, an environmental auditor must be engaged to conduct a section 53X audit to consider if the barrier is no longer required C p.8
    • Condition 4: Ongoing from the date of this Statement, the owner/occupier/owners corporation of the Site must implement and maintain the Environmental Management Plan provided in Attachment 2 of this Statement. C p.8
    • Condition 5: Groundwater at the Site is polluted and not suitable for potable water supply (acceptable), irrigation, stock watering, industrial and commercial, water-based recreation and cultural and spiritual values (continues p9) C p.8
    • Condition 5 (cont.): Groundwater must not be used for any precluded beneficial use without prior testing and review by a suitably qualified professional; may be extracted for environmental monitoring or remediation C p.9
    • Condition 6: Ongoing from the date of this Statement, the GQMP formulated for the Site and verified by the auditor must be implemented and maintained by the owner/occupier/owners corporation (Attachment 3) C p.9
    • Condition 7: The GQMP must remain in force until an environmental auditor verifies in writing it is no longer required, and this is accepted by EPA and advised in writing to the planning authority C p.9
    • Condition 8: If a basement is incorporated in any future development, further assessment and potential mitigation for vapour risks is required; a 53X audit must be conducted to consider this use C p.9
  • Before a certificate (not conditions):
    • Soil and groundwater shall be cleaned up to restore all protected beneficial uses or it is demonstrated through risk assessment that its beneficial uses are no longer precluded. C p.9
  • Contaminants (status, medium, source):
    • chlorinated hydrocarbons | groundwater | detected | source: site C p.9
    • metals/metalloids (iron, lead, manganese and nickel), fluoride, ammonia and nitrate | groundwater | detected | source: regional C p.9
    • arsenic, copper, cobalt, chloride, sodium, sulfate, total dissolved solids, acidic pH (naturally elevated; not pollution) | groundwater | detected | source: natural C p.9
    • asbestos (fragments of bonded asbestos containing material) | fill | detected | source: site C p.3
  • Groundwater restrictions:
    • Groundwater must not be used for any precluded beneficial use without prior testing and review by a suitably qualified professional C p.9
  • Vapour / capping:
    • Physical barriers (concrete/asphalt; 0.5 m clean fill in landscaped areas) over the Site C p.8
    • Basement requires further assessment and potential vapour mitigation, plus a 53X audit C p.9
  • Ongoing obligations:
    • EMP (Attachment 2) must be implemented and maintained C p.8
    • GQMP (Attachment 3) must be implemented and maintained until verified as no longer required C p.9
  • Other duties:
    • EPA has determined groundwater cleaned up so far as reasonably practicable (CUTEP) and the site is within a GQRUZ C p.9
    • EPA may require periodic reassessment of the practicability of groundwater clean up (SEPP Waters cl. 58(4)) C p.9
    • Owner/occupier must provide a copy of this Statement to any person who becomes or proposes to become an owner (s53ZE) C p.9
    • Material excavated from or brought to the Site should be managed per statutory regulations and EPA guidelines C p.9
  • Off-site findings:
    • Site-sourced chlorinated hydrocarbons in groundwater extend off-Site C p.9
    • Zone of groundwater plume influence 76 m from site boundary C p.5
    • Off-site downgradient wells MW52, MW53 (Hamlet St), MW54, MW55 (Wanrua St), MW23A (south), MW59 (nested, deeper); MW56 upgradient on Chandos St A p.185
    • Closest known groundwater extraction bore ~213 m south, beyond likely plume extent; Port Phillip Bay 2.7 km south-west, discharge highly unlikely A p.68
    • GQRUZ declared covering groundwater at and down-gradient of the Site A p.68
  • Plume extent (Part A):
    • CHC groundwater pollution from on-Site sources extends beyond the Site boundary A p.67
    • CHC plume laterally delineated by off-Site down-gradient wells MW52 to MW55 (installed 2017); vertical extent assessed ~15 m from Site boundary (MW52/MW59) A p.51
    • Modelled future VC plume (drinking water exceedance) should not extend beyond 76 m from MW21, south-westerly; furthest extent reached in approximately 41 years A p.68
  • Plume direction (Part A):
  • Groundwater flow:
    • South-west C p.5
    • south-west (watertable aquifer, on-Site); very flat gradient A p.51
    • overall south-west; periodic deviation from west to south possible A p.68
  • Key concentrations (Part A):
    • Chloroform 653 µg/L (groundwater) vs 250 µg/L A p.54
    • Trichloroethene 101 µg/L (groundwater) vs 20 µg/L A p.54
    • cis-1,2-dichloroethene 84 µg/L (groundwater) vs 60 µg/L A p.54
    • Vinyl Chloride 12.6 (groundwater) vs 0.3 µg/L A p.54
    • Dichloromethane 10 µg/L (groundwater) vs 4 µg/L A p.54
    • Tetrachloroethene 484 µg/m3 (soil vapour, sub-slab probes VP01-VP03) A p.58
  • Vapour findings (Part A):
    • All groundwater concentrations of volatile chemicals below adopted site-specific vapour intrusion risk-based levels A p.51
    • Sub-slab soil vapour (VP01-VP03): cis-1,2-DCE up to 148 µg/m3, TCE up to 22 µg/m3, PCE up to 484 µg/m3; all below Tier 1 commercial vapour intrusion screening criteria A p.58
    • Risks to on- and off-Site receptors from CHC vapours from polluted groundwater, including potential future basements, acceptably low A p.68
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: later register audit 0008005969 (2024-02-12, Land Use Suitability) at the same point (9 m)
0008005969322-328 Bay Rd Cheltenham VIC 3192Register maps it over this land; the statement names Lot 20 m S
  • Register: Land Use Suitability · 2024-02-12 · 0 m S (audit polygon) · COVERS THIS LAND (EARLIER/PARENT SITE AUDIT) (overlap 3421.5 m² = 99.1% of parcel, 34.6% of audit area)
  • Document: Environmental audit statement (EP Act 2017) · dated 12 February 2024 · Parts read: C and A · 0 binding conditions, 12 recommendations
  • Coverage: pages read: 2-10, 24, 26, 964-968 of 968 (Part C); pages read: 47, 52, 136, 175, 784-785, 988-989 of 1038 (Part A). Pages not listed were not read; findings on them are not reported.
  • Address conflict: register polygon covers 99.1% of this parcel, but the document names a different site (stated title Lot 2 PS802507 (different lot of the same plan): not this parcel's address/title).
  • Stated site identity: differs: stated title Lot 2 PS802507 (different lot of the same plan)
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant VCHS, chlorinated hydrocarbon C p.965; plume_extent [groundwater] TCE, VCHS A p.52; plume_extent [groundwater] TCE, VC A p.52; plume_extent [groundwater] TCE, VCH A p.47; key_concentration [groundwater] TCE, trichloroeth A p.136; key_concentration [groundwater] TCE, trichloroeth A p.175; key_concentration [groundwater] TCE, trichloroeth A p.175; key_concentration [groundwater] PCE, tetrachloroeth A p.136
  • Source by contaminant group: asbestos: unknown C p.965; chlorinated solvents: site A p.52
  • Outcome:
    • Environmental audit statement (2017 Act): site suitable for commercial use, subject to compliance with the listed recommendations C p.8
  • Suitable for:
  • Conditions / recommendations:
    • Recommendation 1: Prior to occupation, landscaped areas/garden beds must have at least 0.5 m of soil below finished surface, suitable for the site and consistent with 'fill material' (EP Regulations 2021); evidence of compliance to Bayside Council. C p.8
    • Recommendation 2: All physical barriers must be maintained by the occupier and, if damaged or removed, reinstated by the occupier as soon as possible to the same condition or better. C p.8
    • Recommendation 3: If removal of the physical barrier is proposed, the owner must engage an environmental auditor to conduct a s208 audit to consider if the barrier is no longer required. C p.9
    • Recommendation 4: Groundwater cleaned up so far as reasonably practicable, but not suitable for any use and must not be used without prior testing and professional review; extraction allowed for monitoring or remediation. C p.9
    • Recommendation 5: Groundwater [contamination] extends beyond the audit site boundaries and must be managed per the GQMP; owner reviews GQMP every 3 years and informs persons who could be affected. C p.9
    • Recommendation 6: A GQMP (Former Nuplex Chemical Storage Facility, Lots 2, 3 and 4) is attached to the statement and must be implemented by the parties listed in that plan. C p.9
    • Recommendation 7: The GQMP must remain in force until three years from site occupancy, then be reviewed by a suitably qualified professional. C p.9
    • Recommendation 8: By occupancy, a vapour mitigation system (VMS) per the SVB design report (BGL Nominees 9 June 2022) and VMS specification (BGL Nominees, 2024) must be installed, independently verified and reported to Bayside Council. C p.9
    • Recommendation 9: The VMS must be built per the SVB design report and VMS specification, maintained in good repair by the owner, and remain in place in perpetuity while the buildings remain. C p.9
    • Recommendation 10: No basements in endorsed plans; site not suitable for a basement without further assessment and vapour mitigation; any basement requires a new s208 environmental audit. C p.9
    • Recommendation 11: Prior to and ongoing from occupancy, the owner must implement and maintain the SVB design report per the VMS specification, the GQMP and the EMP attached to the statement. C p.9
    • Recommendation 12: Statement is based on the layout of the endorsed plans (PP 520204121); any substantive design change must be verified by an environmental auditor and advised in writing to EPA and the planning authority. C p.9
  • Contaminants (status, medium, source):
    • asbestos | soil | suspected | source: unknown C p.965
    • volatile chlorinated hydrocarbons (VCHs) | soil vapour | suspected | source: unknown C p.965
    • None | groundwater | detected | source: site C p.965
    • also: not detected (NAPL)
  • Groundwater restrictions:
    • Groundwater not suitable for any use; must not be used without prior testing and professional review; extraction allowed for monitoring or remediation C p.9
    • GQRUZ recommended C p.965
    • Precluded groundwater beneficial uses: water dependent ecosystems and species; irrigation; stock watering; industrial and commercial use; primary contact recreation; Traditional Owner cultural values; buildings and structures C p.966
  • Vapour / capping:
    • Physical barrier: at least 0.5 m of suitable soil below finished surface in landscaped areas/garden beds, maintained and reinstated by occupier C p.8
    • Vapour mitigation system (soil vapour barrier) installed and verified by occupancy; maintained in perpetuity while buildings remain C p.9
  • Ongoing obligations:
    • GQMP (Former Nuplex Chemical Storage Facility, Lots 2, 3 and 4): implement; review every 3 years; in force until 3 years after occupancy C p.9
    • Owner must provide adequate information to any person who could be affected by the contamination C p.9
    • Owner must implement and maintain the SVB design report / VMS specification, GQMP and Environmental Management Plan (EMP) C p.9
    • Ongoing groundwater monitoring required C p.966
  • Other duties:
    • Other related information 1: Soil excavated and disposed off-site after the audit must be classified per EPA Publications 1827.2 and 1828.2. C p.10
    • Other related information 2: Fill imported after the audit must be tested and classified as 'Fill Material' per the Environment Protection Regulations 2021. C p.10
  • Off-site findings:
    • Groundwater contamination extends off-site; zone of plume influence 70 m from site boundary C p.965
    • Zone of groundwater plume influence: 70 m from site boundary C p.967
    • Groundwater extends beyond the audit site boundaries and needs to be managed per the GQMP C p.9
    • TCE increased since September 2020 at off-site wells MW34A (upper aquifer) and MW60C (lower aquifer); MW34A exceeds RBC A p.175
    • Groundwater TCE in wells around the down-gradient (south) off-site property increased from 10-14 mg/L (Jan/Mar 2023) to 17-25 mg/L (July 2023) A p.785
    • Off-site bores MW34A/MW34B (15 m south) remain acidic (pH 3.87 and 3.23) and MW34B had SO4 5,600 mg/L in July 2023 after ISCO A p.47
    • 2014: PCE and TCE detections mostly in the south-east corner of the site and off-site to the south-east A p.136
  • Plume extent (Part A):
    • Groundwater beneath the site and off-site to the south polluted by site-sourced VCHs (TCE driver) and benzene, plus remediation by-products A p.52
    • Predicted maximum extent: TCE 150 m and VC 160 m from the southern site boundary in 70 years (EarthEon 2023); auditor's model TCE 130 m in 50 years (20 µg/L) and VC 120 m in 37 years (0.3 µg/L) A p.52
    • TCE/VCH plumes at and down-gradient of the site characterised laterally, vertically and spatially A p.47
  • Plume direction (Part A):
    • south-east, increasing in depth as it migrates A p.47
  • Groundwater flow:
    • South to south-west C p.967
    • south, south-east and south-west (relatively flat gradient); discharge point Port Phillip Bay A p.175
  • Key concentrations (Part A):
    • trichloroethene (TCE) 110,000 ug/L (groundwater, MW26 (January 2014, GHD)) vs 30 ug/L A p.136
    • trichloroethene (TCE) 56,300 µg/L (groundwater, MW61A (July 2023)) A p.175
    • trichloroethene (TCE) 44,600 µg/L (groundwater, MW34A (July 2023; upper aquifer, off-site)) A p.175
    • tetrachloroethene (PCE) 2100 ug/L (groundwater, MW24C (January 2014, GHD)) vs 50 ug/L A p.136
    • TPH C10-C36 10,000 ug/L (groundwater, MW24C (2014, GHD)) vs 600 ug/L A p.136
    • sulfate (SO4) 11,400 mg/L (groundwater, MW57C (September 2020, after ISCO persulfate injection; 58 mg/L by July 2023)) A p.47
  • Vapour findings (Part A):
    • TCE at MW34A and MW61A exceeds site-specific RBC, so potential health risks exist for the site and surrounds; off-site HHRA (15 Chandos St) found VI risks for commercial/industrial workers low and acceptable; vapour barrier to be installed on-site A p.52
    • Off-site indoor air TCE: office 2.5g/m3 and warehouse 1g/m3 (units as printed) below 8g/m3 NEPM criterion /AF 10; HHRA: measured and modelled VI risks low and acceptable; no off-site risk management measures required A p.785
    • Site-specific TCE groundwater SSTLs 18 mg/L (slab-on-grade warehouses) and 8 mg/L (multi-storey offices); TCE at MW24 (35 mg/L) and MW61 (56 mg/L) exceed both, so vapour mitigation systems (VMS) required in Warehouses 4-7 on Lot 2 A p.784
    • 2013 soil vapour: chloroform, carbon tetrachloride, TCE and PCE several orders of magnitude higher at PF7/PF8 (Poisons Flammables building) and PCE, chloroform, TCE, 1,1-DCE, vinyl chloride at SEC11/SEC16 along southern boundary, suggesting residual source… A p.136
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
000800246018 Hamlet StCovers this land (earlier or parent-site audit)0 m SW
  • Register: EPA Processing · 2011-09-08 · 0 m SW (audit polygon) · COVERS THIS LAND (EARLIER/PARENT SITE AUDIT) (overlap 3383.7 m² = 98.0% of parcel, 34.9% of audit area)
  • Document: Risk audit / no statement · dated 8 September 2011 (Completion Date of Audit) · Parts read: C and A · 0 binding conditions, 61 recommendations
  • Coverage: pages read: 1-17 of 18 (Part C); pages read: 76, 146-148, 159-162 of 162 (Part A). Pages not listed were not read; findings on them are not reported.
  • Address conflict: register polygon covers 98.0% of this parcel, but the document names a different site (stated address 18-22 Hamlet St: not this parcel's address/title).
  • Stated site identity: differs: stated address 18-22 Hamlet St
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): condition [groundwater] VCH C p.11; condition [groundwater] chlorinated solvent C p.11; condition [groundwater] chlorinated solvent C p.11; condition [groundwater] VC C p.14; condition [groundwater] chlorinated solvent C p.14; condition [groundwater] chlorinated solvent C p.15; condition [groundwater] VCH C p.15; condition [groundwater] VCH C p.16
  • Source by contaminant group: petroleum hydrocarbons: site C p.6; other: site C p.5; metals/metalloids: site C p.6; chlorinated solvents: site C p.5
  • Outcome:
    • s53V audit (risk of harm to land and groundwater; response to Clean Up Notice): land beneficial uses protected for commercial and industrial use assuming building configuration largely unaltered and a management plan is implemented C p.7
    • With the exception of Maintenance of Aquatic Ecosystems, all other protected beneficial uses of groundwater precluded by contamination arising from the site C p.8
  • Suitable for:
    • commercial and industrial (land beneficial uses protected, subject to building configuration largely unaltered and management plan) C p.7
  • Conditions / recommendations:
    • Recommendation 7 (Site Plan): accurate site plan by a licensed surveyor for future reporting; 4 Months C p.9
    • Recommendation 28: investigate on- and offsite services for leaks affecting groundwater flow and contaminant transport; 6 months C p.9
    • Recommendation 31: search for unregistered bores downgradient of the site (field event, door knocking if required); 6 months C p.9
    • Recommendation 32: obtain groundwater extraction and water supply well information; 6 months C p.9
    • Recommendation 30: investigate sources of TDS variation and mounding (MW3, MW12, MW18) to show whether groundwater is other than Segment A1; 6 months C p.9
    • Recommendation 3: further delineation of impacted soil vapour areas (SEC, Former Drum Storage Area, Poisons Store sump, Area 2 USTs); 6 Months C p.9
    • Recommendation 20: revised soil vapour monitoring network as part of ongoing program with groundwater monitoring; commence immediately, implement within six months C p.9
    • Recommendation 54: additional vapour monitoring event (soil vapour and indoor air) as soon as practicable; 6 Months C p.9
    • Recommendation 21: further consideration of vapour intrusion risk to persons occupying buildings off-site (and potentially on-site); 5 Months C p.10
    • Recommendation 4: detailed human health risk assessment (current use, areas to the south, possible future use), leading to OHS measures in a Site Management Plan (SMP); 9 Months C p.10
    • Recommendation 57: human health risk assessment to be redesigned and repeated to include all relevant exposure pathways after delineation and CSM update C p.10
    • Recommendation 58: additional risk modelling including soil and groundwater sources; commence within 3 months C p.10
    • Recommendation 59: assess how the risk profile may change with time; commence within 3 months C p.10
    • Recommendation 60: immediate re-assessment of risks to off-site workers; commence within 3 months C p.11
    • Recommendation 1: identify and investigate potential source zones in northern half of site; 12 Months C p.11
    • Recommendation 38: investigate other sources of VCH impacts by soil, soil vapour and groundwater investigations; 12 Months C p.11
    • Recommendation 2: investigate groundwater data gaps in Northern and Central Areas; 12 Months C p.11
    • Recommendation 11: plan and install revised permanent monitoring network on- and off-site, including deeper BGA and FFA; 9 Months C p.11
    • Recommendation 33: use the Auditor's CSM to develop revised monitoring well network to delineate plume(s); 9 Months C p.11
    • Recommendation 35: improve monitoring well network to evaluate depth of chlorinated solvent impact on- and off-site; 12 Months C p.11
    • Recommendation 48: improve monitoring well network to evaluate degradation of chlorinated solvents on- and off-site; 12 Months C p.11
    • Recommendation 56: revised network to characterise risks beyond the SEC and risks to offsite receptors C p.12
    • Recommendation 22: mass flux plane approach for management of contaminant transport (soil vapour and groundwater); implement within 12 months C p.12
    • Recommendation 23: mass flux transects T1 to T4 with soil vapour and groundwater depth-discrete locations; 12 Months C p.12
    • Recommendation 53: evaluate mass flux from source areas and along plume flow path using four transects; 12 Months C p.12
    • Recommendation 12: revised permanent network to include shallow, intermediate and deep portions of the aquifer(s); 12 Months C p.12
    • Recommendation 13: obtain evidence for a locally significant low permeability unit limiting hydraulic connection (and DNAPL migration); within 12 months C p.13
    • Recommendation 14: additional wells across the water table (in addition to deeper wells) C p.13
    • Recommendation 15: monitoring well construction to consider presence of DNAPLs C p.13
    • Recommendation 16: collect aquifer media (soil) samples for physical parameters in BGA and FFA boreholes; within 12 months C p.13
    • Recommendation 36: appropriate precautions during DNAPL investigations, including sumps at bases of monitoring wells C p.13
    • Recommendation 37: methods for observing DNAPL including Flute liners during monitoring well installation C p.13
    • Recommendation 8: down-hole geophysics on newly installed wells in BGA and FFA; 15 Months C p.13
    • Recommendation 18: groundwater pumping tests and slug tests in BGA and FFA; 15 Months C p.13
    • Recommendation 24: in-situ measurement devices (down-hole data loggers) to be part of the program developed within the GQMP; commencing within six months C p.14
    • Recommendation 26: groundwater hydraulic control via revised network and quarterly SWL monitoring; commencing within six months C p.14
    • Recommendation 29: use quarterly water level monitoring to evaluate vertical gradients; commence immediately C p.14
    • Recommendation 55: revised network to be initiated with annual monitoring and reporting; 15 Months C p.14
    • Recommendation 25: SMP to consider alternative sampling methods to reduce LORs; next GME and ongoing C p.14
    • Recommendation 5: address elevated LOR data quality issues and present LOR values in figures and tables; next GME and ongoing C p.14
    • Recommendation 6: collect groundwater samples enabling partitioning to air/soil to address matrix interference (e.g. for VC); next GME C p.14
    • Recommendation 17: evaluate scan sampling to enhance detection of chlorinated solvent plumes; within 15 months C p.14
    • Recommendation 51: analyse groundwater for alcohols and fatty acids as evidence of degradation; within 15 months C p.15
    • Recommendation 9: decommission specified wells (MW6-MW17 multilevel, MW3, MW4, MW5, MW21, MW23, MW18, MW2 and others); 12 Months C p.15
    • Recommendation 10: replace wells with quality issues in areas of high chlorinated solvent concentrations; 12 Months C p.15
    • Recommendation 27: develop 3D groundwater flow model with steady-state and transient calibration; 18 Months C p.15
    • Recommendation 46: 3D fate and transport modelling of potential for VCH impacts to be captured by local groundwater extraction; 18 Months C p.15
    • Recommendation 61: implement GHD-recommended SMP for on-site intrusive workers within one month (odours, acute and lifetime health risks); timetable 2 Months, reassess within 12 months C p.15
    • Recommendation 41: interim action within six months - keep SEC southern boundary accessible, cover grassed area in SEC, install interim remedial measures to limit off-site migration of soil vapour and groundwater plumes C p.16
    • Recommendation 19: revised monitoring network to form part of an SMP, maintained until EPA approves cessation; SMP endorsed by an appointed auditor; 18 Months C p.16
    • Recommendation 45: implement long-term management plan (ongoing SMP) for the current built environment; 18 Months C p.16
    • Recommendation 34: use and update the CSM for future investigations; ongoing C p.16
    • Recommendation 39: detailed evaluation and report on presence of DNAPLs; 18 Months C p.16
    • Recommendation 47: evaluate potential for shallow VCH plumes to intersect PHC contamination off-site downgradient; 18 Months C p.16
    • Recommendation 49: updated discussion of VCH degradation pathways; 6 Months C p.16
    • Recommendation 50: further evaluate intrinsic capacity of aquifer to degrade volatile contaminants; 15 Months C p.16
    • Recommendation 52: investigate microbial processes (including microcosm studies) for biological degradation; 15 Months C p.17
    • Recommendation 40: Remediation Feasibility Study for short-term interim options; within four months C p.17
    • Recommendation 42: revised RFS for long-term clean up options, considering administrative tools to protect future groundwater users from intercepting the plume; 21 Months C p.17
    • Recommendation 43: prepare a Clean Up Plan after adequate characterisation and delineation; 24 Months C p.17
    • Recommendation 44: Clean Up Plan for the SEC to consider volatile detections in soil and soil vapour; 24 Months C p.17
  • Before a certificate (not conditions): not stated
  • Contaminants (status, medium, source):
    • volatile chlorinated hydrocarbons (VCHs) | soil | detected | source: site C p.5
    • volatile chlorinated hydrocarbons (VCHs) | groundwater | detected | source: site C p.6
    • TPH | groundwater | detected | source: site C p.6
    • BTEX | groundwater | detected | source: site C p.6
    • DNAPL (chlorinated solvents) | soil | suspected | source: site C p.6
    • petroleum hydrocarbons (PHCs) | groundwater | detected | source: site C p.5
    • volatile contaminants (unspecified) | soil vapour | detected | source: site C p.5
    • metals (unspecified) | groundwater | detected | source: site C p.6
    • petroleum hydrocarbons (mainly chlorinated hydrocarbons) | soil | detected | source: site C p.7
    • benzene | groundwater | detected | source: site C p.7
    • TPH C6-C9 | soil | detected | source: site C p.17
    • chlorobenzene | soil | detected | source: site C p.17
    • PCE | soil | detected | source: site C p.17
    • TCE | soil | detected | source: site C p.17
    • cDCE | soil | detected | source: site C p.17
    • 1,1-DCE | soil | detected | source: site C p.17
    • 1,1,1-TCA | soil | detected | source: site C p.17
    • 1,1-DCA | soil | detected | source: site C p.17
    • vinyl chloride (VC) | soil vapour | detected | source: site C p.17
    • also: not assessed (deeper VCH contamination), not detected (LNAPL / hydrocarbon sheens on water table (not observed))
  • Groundwater restrictions:
    • All protected beneficial uses of groundwater except Maintenance of Aquatic Ecosystems precluded by site contamination (finding, not a formal restriction) C p.4
  • Vapour / capping:
    • No enclosed structure intended for human occupation to be built on the SEC without remedial works; management plan to protect persons if site covering is breached C p.7
  • Ongoing obligations:
    • Site Management Plan (SMP) for on-site intrusive workers to be implemented as soon as possible; manage odours, acute and lifetime health risks C p.4
    • Revised monitoring network part of SMP, maintained until cessation of monitoring approved by EPA C p.16
    • Audit required by Clean Up Notice under s62A (CUN EPA Ref: NO9097) C p.2
  • Off-site findings:
    • Groundwater contamination extends approximately 90m off site to the south to at least Phillip Street C p.3
    • Chlorinated hydrocarbon contamination offsite to the south in adjoining properties (MW26, MW34) and up to 150 m off-site at Philip Street; BTEX to the southwest C p.8
    • VCH-contaminated soil likely extends from the site to the south and possibly the east C p.5
    • also: not stated
  • Plume extent (Part A): not stated
  • Plume direction (Part A): not stated
  • Groundwater flow:
    • Generally southerly, but with easterly and westerly components; not simple or uniform, uncertainty remains C p.8
    • also: not stated
  • Key concentrations (Part A):
    • Trichloroethene 423,000 µg/L (groundwater, MW15/3) A p.146
    • Dichloromethane 179,000 µg/L (groundwater, MW15/3) A p.146
    • TPH C6 - C9 440,000 µg/L (groundwater) A p.148
    • cis-1,2-dichloroethene 24,400 µg/L (groundwater, MW24C) A p.146
    • Chloroform 11,600 µg/L (groundwater, MW3) A p.147
    • Tetrachloroethene 5740 µg/L (groundwater, MW24C) A p.146
  • Vapour findings (Part A): not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008005308Hamlet StNeighbour0 m S
  • Register: 53X Statement · 2020-08-28 · 0 m S (audit polygon) · NEIGHBOUR (STATED ADDRESS DIFFERS)
  • Document: Statement (EP Act 1970) · dated 28 August 2020 · Parts read: C and A · 5 binding conditions, 0 recommendations
  • Coverage: pages read: 1-12 of 12 (Part C) (complete); pages read: 144-145, 273, 275, 277, 279, 281, 283 of 302 (Part A). Pages not listed were not read; findings on them are not reported.
  • Stated site identity: differs: stated title Lot 4 PS802507 (different lot of the same plan)
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant TCE C p.4; contaminant TCE C p.4; contaminant [groundwater] trichloroeth C p.10; contaminant [groundwater] vinyl chloride C p.10; contaminant [groundwater] 1,1,2-trichlo, carbon tetrachloride, chlorinated ethane, chloroform, cis-1,2, di C p.10; offsite_finding [groundwater] chlorinated solvent C p.10; key_concentration [groundwater] dichloroethane A p.144; key_concentration [groundwater] dichloroethane A p.144
  • Source by contaminant group: nutrients: regional C p.10; petroleum hydrocarbons: regional C p.10; metals/metalloids: regional (natural/background) C p.10; other: off-site C p.5; asbestos: site C p.11; chlorinated solvents: regional C p.10
  • Outcome:
    • Statement of environmental audit: suitable for commercial and industrial land uses subject to conditions C p.9
  • Suitable for:
    • commercial and industrial land uses C p.9
  • Conditions / recommendations:
    • Condition A: If a basement is incorporated in any future development, further assessment and potential vapour/odour mitigation is required; an environmental auditor must be engaged to conduct a section 53X audit to consider this use. C p.9
    • Condition B: Any landscaped area or garden bed must be constructed and maintained with at least 0.5 m of soil below the finished surface, suitable for the site and consistent with IWRG 621 as 'fill material' (or commercially sourced garden soil). C p.9
    • Condition C: All physical barriers (condition B) must be maintained and, if damaged or removed, reinstated as soon as possible to the same condition or better. C p.10
    • Condition D: If removal of the physical barrier is proposed, an environmental auditor must be engaged to conduct a section 53X audit to consider if the barrier is no longer required. C p.10
    • Condition E: Groundwater at the site is polluted and not suitable for any beneficial use; must not be used without prior testing and review by a suitably qualified professional; may be extracted for monitoring or remediation. C p.10
  • Before a certificate (not conditions):
    • (i) Clean-up of polluted groundwater such that all beneficial uses of groundwater are restored. C p.10
    • (ii) All chemically unsuitable soils and materials are remediated such that all beneficial uses of land are restored. C p.10
  • Contaminants (status, medium, source):
    • antimony, barium, cobalt, copper, manganese, mercury, TRH F3, bis(2-ethylhexyl) phthalate, di-n-butyl phthalate, TCE, chromium VI | soil | detected | source: unknown C p.4
    • antimony, cobalt, TCE | soil | detected | source: unknown C p.4
    • arsenic, cobalt, lead, iron, nickel, ammonia, nitrate | groundwater | detected | source: regional C p.10
    • trichloroethene | groundwater | detected | source: regional C p.10
    • vinyl chloride | groundwater | detected | source: regional C p.10
    • 1,1-dichloroethane, carbon tetrachloride, 1,2-dichlorobenzene, 1,4-dichlorobenzene, 1,1,2-trichloroethane, 1,1-dichloroethene, 1,2-dichloroethane, chloroform, cis-1,2-dichloroethene, dichloromethane, tetrachloroethene | groundwater | detected | source:… C p.10
    • TRH C6-C10, benzene, xylenes, trihalomethanes | groundwater | detected | source: regional C p.10
    • pH, copper, zinc, sulphate, sodium, chloride (natural) | groundwater | detected | source: natural C p.10
    • DNAPL | groundwater | suspected | source: off-site C p.5
    • asbestos containing material | ? | detected | source: site C p.11
  • Groundwater restrictions:
    • Groundwater polluted, not suitable for any beneficial use; no use without prior testing and review by a suitably qualified professional; extraction for monitoring or remediation only. C p.10
    • EPA determined (18 August 2020) groundwater cleaned up to the extent practicable and the site is a GQRUZ. C p.10
  • Vapour / capping:
    • Minimum 0.5 m clean soil (physical barrier) in all landscaped areas/garden beds, to be maintained and reinstated if damaged. C p.9
    • Basement not assessed; any basement requires further assessment and potential vapour/odour mitigation via a new 53X audit. C p.9
  • Ongoing obligations:
    • No specific GQMP requirement for Lot 4; ongoing groundwater monitoring conducted under the Lot 2 GQMP (bi-annual, March 2020 to September 2022), Chandos Bay responsible. C p.11
    • Owner/occupier must provide a copy of the Statement to any person who becomes or proposes to become occupier (s53ZE) C p.11
  • Other duties:
    • Chandos Bay Pty Ltd is responsible for all future groundwater monitoring for Lot 2 (GQMP), including selected Lot 3 wells; confirmed via a Notice to Identify Occupier with EPA. C p.10
    • EPA may require periodic reassessment of the practicability of groundwater clean-up (Clause 58(4) SEPP (Waters)). C p.11
    • Groundwater monitoring bores not required for the GQMP should be decommissioned per 'Minimum Construction Requirements for Water Bores in Australia'. C p.11
    • Asbestos removal must be conducted per OHS Regulations 2007 (Part 4.3) by a licensed contractor prior to occupation. C p.11
    • Imported fill or soil must be chemically tested and classify as 'fill material' per EPA guidelines. C p.11
    • Soils excavated and disposed off-site must be classified and managed per statutory regulations and EPA guidelines (e.g. IWRG 621). C p.11
    • Soil contains naturally slightly acidic pH, typical of regional soil; may affect some introduced plants, grasses and fauna. C p.11
  • Off-site findings:
    • Potential DNAPL in wells MW50B and MW50C considered sourced from off-site (Lot 2). C p.5
    • Groundwater precluding substances (metals, chlorinated solvents, hydrocarbons) are not derived from the site but are regional in nature. C p.10
    • TPH C6-C9 detected in off-site down-gradient wells: MW26 129,000-136,000 ug/L, MW34A up to 58,400 ug/L, MW34B up to 27,800 ug/L, MW25 14,200-14,600 ug/L (2019-2020) A p.283
    • Monitoring wells classified by location: MW24AR/BR/CR = Lot 2 (Source); MW25, MW26, MW34A, MW34B = Off Site (Down Gradient); MW32, MW35 = Lot 2 (Up Gradient); MW50A = Lot 3 (Cross Gradient) A p.273
    • also: not stated
  • Plume extent (Part A):
    • Contamination reaches off-site down-gradient wells MW25, MW26, MW34A and MW34B (TPH C6-C9 up to 136,000 ug/L at MW26); distance off-site not stated A p.283
  • Plume direction (Part A): not stated
  • Groundwater flow:
    • West to southwest C p.7
    • also: not stated
  • Key concentrations (Part A):
    • TPH C6-C9 136,000 ug/L (groundwater, MW26 (Off Site, Down Gradient)) A p.283
    • TPH C6-C9 58,400 ug/L (groundwater, MW34A (Off Site, Down Gradient)) A p.283
    • TPH C6-C9 18,000 ug/L (groundwater, MW24AR (Lot 2, Source)) A p.283
    • 1,2-Dichloroethane 4,530 ug/L (groundwater, MW35) A p.144
    • 1,2-Dichloroethane 800 ug/L (groundwater, MW50B) A p.144
    • 1,2-Dichloroethane 465 ug/L (groundwater, MW24AR) A p.144
  • Vapour findings (Part A): not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008005307Hamlet StWithin 500 m68 m S
  • Register: 53X Statement · 2020-02-28 · 68 m S (audit polygon) · NEARBY
  • Document: Statement (EP Act 1970) · dated 28 February 2020 · Parts read: C and A · 5 binding conditions, 0 recommendations
  • Coverage: pages read: 1-12 of 18 (Part C); pages read: 85, 129-130, 133-134, 188, 191-192 of 242 (Part A). Pages not listed were not read; findings on them are not reported.
  • Stated site identity: differs: stated address Hamlet Street; Bay Rd
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant [groundwater] trichloroeth C p.11; contaminant [groundwater] tetrachloroeth C p.11; contaminant [groundwater] cis-1,2, dichloroethe C p.11; contaminant [groundwater] vinyl chloride C p.11; contaminant [groundwater] carbon tetrachloride C p.11; contaminant [groundwater] 1,1,2-trichlo, dichloroethane, dichloroethe C p.11; contaminant [groundwater] chloroform, dichloromethane C p.11; contaminant TCE C p.4
  • Source by contaminant group: metals/metalloids: site C p.11; petroleum hydrocarbons: regional C p.11, site C p.11; nutrients: regional C p.11; chlorinated solvents: off-site/up-gradient C p.4, regional C p.11
  • Outcome:
    • Statement of environmental audit: suitable for commercial and industrial land uses subject to conditions C p.10
  • Suitable for:
    • commercial and industrial land uses C p.10
  • Conditions / recommendations:
    • Condition A: Statement is referrable to the attached development plan (commercial use with a caretaker's residence on the first floor within the existing warehouse configuration); substantive changes must be verified by an environmental auditor and advised… C p.10
    • Condition B: Any landscaped area or garden bed must be constructed and maintained with at least 0.5 m of soil below the finished surface, suitable for the site and consistent with IWRG 621 as 'fill material' (or commercially sourced garden soil). C p.10
    • Condition C: All physical barriers (condition B) must be maintained and, if damaged or removed, reinstated as soon as possible to the same condition or better. C p.11
    • Condition D: If removal of the physical barrier is proposed, an environmental auditor must be engaged to conduct a section 53X audit to consider if the barrier is no longer required. C p.11
    • Condition E: Groundwater at the site is polluted and is not suitable for any beneficial use; must not be used without prior testing and review by a suitably qualified professional; may be extracted for monitoring or remediation. C p.11
  • Before a certificate (not conditions):
    • (i) Clean-up of polluted groundwater such that all beneficial uses of groundwater are restored. C p.11
    • (ii) All chemically and aesthetically unsuitable soils and materials are remediated such that all beneficial uses of land are restored. C p.11
  • Contaminants (status, medium, source):
    • arsenic | groundwater | detected | source: site C p.11
    • benzene | groundwater | detected | source: site C p.11
    • ethylbenzene | groundwater | detected | source: site C p.11
    • trichloroethene | groundwater | detected | source: regional C p.11
    • tetrachloroethene | groundwater | detected | source: regional C p.11
    • cis-1,2-dichloroethene | groundwater | detected | source: regional C p.11
    • vinyl chloride | groundwater | detected | source: regional C p.11
    • carbon tetrachloride | groundwater | detected | source: regional C p.11
    • 1,1-dichloroethane, 1,1-dichloroethene, 1,2-dichloroethane, 1,1,2-trichloethane | groundwater | detected | source: regional C p.11
    • 1,2-dichlorobenzene and 1,4-dichlorobenzene | groundwater | detected | source: regional C p.11
    • chloroform, dichloromethane, trihalomethanes | groundwater | detected | source: regional C p.11
    • TRH C6-C10 | groundwater | detected | source: regional C p.11
    • metals and inorganics (cobalt, iron, manganese, nickel, lead, nitrate, fluoride) | groundwater | detected | source: regional C p.11
    • cobalt, copper, lead, manganese, zinc, TRH F2, TCE and chromium VI | soil | detected | source: unknown C p.4
    • cobalt, lead, TRH F1, TRH F2 and TCE | soil | detected | source: unknown C p.4
    • anthropogenic inclusions in fill; hydrocarbon odours and/or staining in soil | fill | detected | source: unknown C p.4
  • Groundwater restrictions:
    • Groundwater polluted and not suitable for any beneficial use; no use without prior testing and review by a suitably qualified professional; extraction allowed for monitoring or remediation (Condition E) C p.11
  • Vapour / capping:
    • Minimum 0.5 m suitable soil in landscaped areas/garden beds acting as a physical barrier, to be maintained and reinstated (Conditions B and C) C p.11
    • also: not stated (vapour mitigation)
  • Ongoing obligations:
    • Ongoing groundwater monitoring via the Lot 2 GQMP (Chandos Bay responsible) includes selected Lot 3 wells, bi-annual March 2020 to September 2022; no specific GQMP requirement for Lot 3 C p.12
    • Owner/occupier must provide a copy of the Statement to any person who becomes or proposes to become the occupier (s53ZE) C p.12
  • Other duties:
    • On 10 September 2019 EPA determined groundwater cleaned up to the extent practicable and the site is within a GQRUZ C p.11
    • Groundwater contains naturally elevated pH, copper, zinc, sulphate, sodium and chloride, typical of regional groundwater; not pollution C p.11
    • EPA may require periodic reassessment of the practicability of groundwater clean-up (Clause 58(4) SEPP Waters) C p.12
    • Monitoring bores not required by the GQMP should be decommissioned per Minimum Construction Requirements for Water Bores in Australia C p.12
    • Asbestos containing material reported in the 'J Store' building; removal or refurbishment must follow OHS Regulations 2007 Part 4.3 using a licensed contractor prior to occupation C p.12
    • Imported fill must be tested and classify as fill material; excavated soils disposed off-site must be classified and managed per regulations and EPA guidelines (IWRG 621) C p.12
    • Soil with odours and/or staining may be present; not a human health risk for the proposed development but may cause noticeable odour if exposed C p.12
    • Soil contains naturally elevated pH (slightly acidic) and vanadium, typical of regional soil; not pollution C p.12
  • Off-site findings:
    • Concentrations indicative of potential DNAPL in Lot 3 wells considered sourced from off-site (Lot 2) C p.5
    • Chlorinated hydrocarbons, TRH C6-C10, metals and inorganics in site groundwater considered sourced from an off-site source C p.4
    • Groundwater plume zone of influence unlikely to extend more than approximately 10m beyond the site boundary C p.7
    • Lead in off-site down-gradient well MW29 at max 8 ug/L (three preceding GMEs <1 to 1 ug/L) A p.85
    • Off-site up-hydraulic-gradient lead pollution across the wider Nuplex site (e.g. MW7 1,070 ug/L, MW11 385 ug/L); auditor attributes Lot 3 lead to an off-site source, not site-derived A p.85
    • Cobalt precludes beneficial uses off-site in MW40 A p.85
    • Highest cobalt in off-site up-gradient wells (MW12 125, MW32 117, MW13 101, MW15 89, MW34B 74 ug/L); site not considered a likely cobalt source A p.85
  • Plume extent (Part A):
    • Lead reported in off-site down-gradient well MW42 on Phillip Street, ≈120 m south (historical max 11 ug/L), and in off-site down-gradient MW29 (max 8 ug/L) A p.85
  • Plume direction (Part A):
    • Lead pollution centred on Lot 1 and central northern Lot 2, potentially extending off-site or originating from off-site to the east (MW7) A p.85
  • Groundwater flow:
    • West to southwest C p.7
    • Down-gradient appears to be to the south (inferred: off-site well MW42 ≈120 m south is described as down-gradient) A p.85
  • Key concentrations (Part A):
    • TRH C6-C10 minus BTEX 132,000 µg/L (groundwater, MW26 (22/08/17)) A p.130
    • TRH C6-C10 minus BTEX 64,400 µg/L (groundwater, MW50B (27/10/17)) A p.130
    • 1,2-dichloroethane 1,550 µg/L (groundwater, MW26 (27/10/17)) A p.133
    • 1,1-dichloroethene 577 µg/L (groundwater, MW24CR, Lot 2 (25/08/17)) A p.133
    • Lead 1,070 ug/L (groundwater, MW7 (off-site, up-hydraulic gradient, wider Nuplex site)) A p.85
    • Cobalt 125 ug/L (groundwater, MW12 (off-site, up-gradient of Lot 3)) A p.85
  • Vapour findings (Part A): not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008006402Graham RdWithin 500 m127 m N
  • Register: 53X Statement · 2020-05-25 · 127 m N (audit polygon) · NEARBY
  • Document: Statement (EP Act 1970) · dated 25 May 2020 · Parts read: C and A · 1 binding conditions, 0 recommendations
  • Coverage: pages read: 1-4, 53-56 of 57 (Part C); pages read: 99, 104, 118, 122-123, 132-134 of 145 (Part A). Pages not listed were not read; findings on them are not reported.
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant [groundwater] trichloroeth C p.4; offsite_finding [groundwater] TCE C p.4; plume_extent [groundwater] TCE A p.123; vapour_finding TCE A p.123 · reported at other properties only: plume_direction A p.123; key_concentration A p.99; offsite_finding A p.123
  • Source by contaminant group: asbestos: site C p.4; chlorinated solvents: off-site/up-gradient C p.4
  • Outcome:
    • Statement of Environmental Audit (s53X EP Act 1970): suitable for listed uses subject to conditions; certificate not issued C p.3
  • Suitable for:
  • Conditions / recommendations:
    • Condition 1: From the date of completion of this audit, the owner of the site must implement and maintain the Environmental Management Plan (22 May 2020) which forms part of this Statement of Environmental Audit and is also attached to this environmental… C p.3
  • Before a certificate (not conditions):
    • Removal of all residual ACM impacted fill and aesthetic impacts within designated Tree Protection Zones and beneath the area labelled as Fifth St. C p.4
  • Contaminants (status, medium, source):
    • asbestos containing materials (ACM) | fill | detected | source: site C p.4
    • trichloroethene | groundwater | detected | source: off-site C p.4
  • Groundwater restrictions: not stated
  • Ongoing obligations:
    • Owner must implement and maintain the Environmental Management Plan (22 May 2020); ongoing management of soils (ACM) in Tree Protection Zones and beneath Fifth St C p.4
    • Occupier must provide a copy of the Statement to any person proposing to become an occupier (s53ZE) C p.4
  • Other duties:
    • Occasional ACM fragments may be encountered during excavation elsewhere on site; not a health risk to occupiers; must be handled and disposed per regulations. C p.4
    • Groundwater contains naturally elevated chloride, nitrate, TDS, copper and zinc; typical of natural groundwater and not pollution under clause 15(d) SEPP (Waters) 2018. C p.4
  • Off-site findings:
    • TCE in site groundwater (southern part) associated with an off-site source to the south of the site C p.4
    • Off-site sources: TCE in groundwater at Bay Street immediately south (attributed to that property); steel fabrication facility at Graham Road and light industry to north east A p.123
    • VOCs (vinyl chloride, cis-1,2-DCE, DCM, TCE, PCE) in groundwater up-hydraulic gradient (north east) at Graham Road; GQRUZ implemented there A p.99
    • Groundwater metals impacts are regional, from up-gradient off-site sources to the east and south A p.134
    • Nearest surface water body: Melbourne Water flood retarding basin, Avoca Street, ~650 m west down-hydraulic gradient; interception unlikely A p.123
  • Plume extent (Part A):
    • Off-site TCE plume from Bay Street (immediately south) migrated onto the audit site at MW06 A p.123
    • also: not detected (site-sourced off-site groundwater migration)
  • Plume direction (Part A):
    • Off-site TCE migrated northwards onto the site from the adjacent property to the south (Bay St) A p.123
  • Groundwater flow:
    • west (retarding basin ~650 m down-hydraulic gradient west of the site) A p.123
    • north east of the audit site is up-hydraulic gradient (Graham Road) A p.99
    • hydraulically up-gradient sources located off-site to the east and south of the site A p.134
    • also: not stated
  • Key concentrations (Part A):
    • Trichloroethene (TCE) 8.25 µg/L (groundwater, MW06 (2009 and 2012; below LOR in 2019); attributed to Bay St) vs 20 µg/L A p.123
    • Vinyl chloride 0.027 mg/L (groundwater, off-site bores at Graham Road (May 2017 to April 2018)) A p.99
    • Zinc 0.52 mg/L (groundwater, bores at Graham Road (off-site, range 0.008 to 0.52)) A p.99
    • Nickel 127 mg/kg (soil, one of 51 samples) vs 90 mg/kg A p.118
  • Vapour findings (Part A):
    • CH2M 2016 vapour assessment did not detect TCE in soil vapour; TCE in MW06 poses no risk to current or future site users A p.123
    • Passive soil vapour assessment indicates negligible soil vapour risk; volatile concentrations very low A p.133
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008000826Graham RdWithin 500 m138 m N
  • Register: 53X Statement · 1999-08-10 · 138 m N (audit point) · NEARBY
  • Document: Statement (EP Act 1970) · dated 10 August 1999 · Part read: C · 3 binding conditions, 0 recommendations
  • Coverage: pages read: 1-3 of 3 (Part C) (complete)
  • Register documents: Parts C, A and B; read: C
  • Source by contaminant group: metals/metalloids: unknown C p.3 scan; salinity/major ions: unknown C p.3 scan
  • Outcome:
    • Section 57AA statement of environmental audit (Stage 2, western portion of Graham Road, Highett): site suitable for listed uses subject to conditions C p.3 scan
    • Certificate of Environmental Audit not issued; condition of site detrimental or potentially detrimental to one or more beneficial uses C p.3 scan
  • Suitable for:
    • medium or high density residential use as permitted under the site zoning C p.3 scan
    • permitted residential development as shown on Site Development Plan No. H-7249A, Feb 1998 (Hoban Hynes Pty Ltd), or similar development C p.3 scan
  • Conditions / recommendations:
    • Condition 1(a)(i): the site developers, owners and occupiers recognise that the site soils in some locations contain contamination at a concentration which may present potential risks to the environment under some site use conditions C p.3 scan
    • Condition 1(a)(ii): the site developers, owners and occupiers avoid planting and cultivation of plant species which are sensitive to elevated concentrations of copper in soils or low soil pH. C p.3 scan
    • Condition 1(b): development per Site Development Plan No. H-7249A (Feb 1998) or similar, provided conditions 1(a) are observed C p.3 scan
  • Contaminants (status, medium, source):
    • copper | soil | detected | source: unknown C p.3 scan
    • low pH | soil | detected | source: unknown C p.3 scan
    • contaminants exceeding threshold for sensitive uses (not individually named beyond copper) | soil | detected | source: unknown C p.3 scan
    • also: not stated (groundwater contaminants)
  • Groundwater restrictions: not stated
  • Vapour / capping: not stated
  • Ongoing obligations:
    • Owners and occupiers to avoid planting/cultivating plant species sensitive to copper or low soil pH C p.3 scan
  • Other duties:
    • Copper/low pH risk may be significant if site used for sensitive species, e.g. horticultural production, parks/gardens or low density residential use C p.3 scan
  • Off-site findings: not stated
  • Groundwater flow: not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008000825Graham RdWithin 500 m143 m NE
  • Register: 53X Certificate · 1999-03-24 · 143 m NE (audit point) · NEARBY
  • Document: Certificate (EP Act 1970) · dated 24 March 1999 · Part read: C · 0 binding conditions, 0 recommendations
  • Coverage: pages read: 1-2 of 2 (Part C) (complete)
  • Register documents: Parts C, A and B; read: C
  • Outcome:
    • Certificate of Environmental Audit (Section 57AA), Graham Road, Highett, Stage 1: condition of the site neither detrimental or potentially detrimental to any beneficial use C p.2 scan
  • Suitable for:
    • any beneficial use C p.2 scan
  • Conditions / recommendations:
  • Contaminants (status, medium, source): not stated (any contaminant)
  • Off-site findings: not stated
  • Groundwater flow: not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008000137Merindah AveWithin 500 m262 m SE
  • Register: 53X Certificate · 1996-01-30 · 262 m SE (audit point) · NEARBY
  • Document: Certificate (EP Act 1970) · dated 30/1/96 · Part read: C · 0 binding conditions, 0 recommendations
  • Coverage: pages read: 1-2 of 2 (Part C) (complete)
  • Register documents: Parts C, A and B; read: C
  • Outcome:
    • Certificate of Environmental Audit No. A31\00020\1996\1 (Section 57AA, 1970 Act): condition of the land is neither detrimental nor potentially detrimental to any beneficial use C p.2 scan
  • Suitable for:
    • any beneficial use of the land at the site C p.2 scan
  • Conditions / recommendations:
  • Contaminants (status, medium, source): not stated (soil and groundwater contaminants)
  • Off-site findings: not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008003039Graham RdWithin 500 m343 m N
  • Register: 53X Certificate · 2020-04-20 · 343 m N (audit polygon) · NEARBY
  • Document: Certificate (EP Act 1970) · dated 20 April 2020 · Parts read: C and A · 0 binding conditions, 0 recommendations
  • Coverage: pages read: 1-10 of 10 (Part C) (complete); pages read: 28, 44, 47, 51, 63, 71-73 of 83 (Part A). Pages not listed were not read; findings on them are not reported.
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): key_concentration [groundwater] vinyl chloride A p.47; offsite_finding [groundwater] DCE, PCE, TCE, cis-1,2, vinyl chloride A p.47 · reported at other properties only: key_concentration A p.47; offsite_finding A p.44
  • Source by contaminant group: metals/metalloids: off-site C p.3; asbestos: site C p.3; chlorinated solvents: off-site/up-gradient A p.46
  • Outcome:
    • Certificate of Environmental Audit: condition of site is neither detrimental nor potentially detrimental to any beneficial use of the site C p.3
  • Suitable for:
    • any beneficial use of the site C p.3
  • Conditions / recommendations:
  • Contaminants (status, medium, source):
    • lead | groundwater | detected | source: off-site C p.3
    • silver | groundwater | detected | source: off-site C p.3
    • copper | groundwater | detected | source: off-site C p.3
    • mercury | groundwater | detected | source: off-site C p.3
    • zinc | groundwater | detected | source: off-site C p.3
    • bonded asbestos containing materials (ACM) | soil | detected | source: site C p.3
    • bonded asbestos containing material (ACM) and inert waste | fill | detected | source: site C p.7
  • Groundwater restrictions:
    • No protected groundwater beneficial uses precluded (agriculture/irrigation, stock watering, primary contact recreation, industrial and commercial water use, buildings and structures: No; others Not relevant) C p.7
  • Other duties:
    • Other related information: groundwater metals (lead, silver, copper, mercury, zinc) above adopted ecological criteria are associated with off-site sources of pollution and regional groundwater conditions; the pollution is not sourced from the site. C p.3
    • Other related information: ACM fragments encountered during future development or use must be handled and disposed in accordance with relevant regulations and guidelines. C p.3
    • Other related information: any material excavated and disposed off-site must be classified and managed in accordance with relevant statutory regulations and EPA guidelines. C p.3
  • Off-site findings:
    • Off-site sources of pollution and regional groundwater conditions associated with metals in site groundwater C p.3
    • vinyl chloride and other VOCs (cis-1,2-DCE, DCM, TCE, PCE) present in groundwater up-hydraulic gradient (east) of the audit site A p.47
    • metals impacts in groundwater associated with regional impacts from hydraulically up-gradient off-site sources to the east A p.73
    • CH2M concluded TCE impacts beneath Bay Street (south of Grassy Woodland) not sourced from the CSIRO site A p.44
    • lead, silver, copper, mercury, zinc above water-dependent-ecosystem criterion, reflective of ambient regional groundwater A p.71
    • six USTs on wider CSIRO site (off the audit site, in Grassy Woodland and Highett North) removed by JFTA in early 2004 A p.28
  • Plume extent (Part A): not detected (off-site migration of groundwater contamination from the site)
  • Plume direction (Part A): not stated
  • Groundwater flow:
    • West-southwest C p.8
    • up-hydraulic gradient is to the east of the audit site (i.e. flow from the east) A p.47
  • Key concentrations (Part A):
    • vinyl chloride up to 0.027 mg/L (groundwater, off-site bores at Graham Road (May 2017 to April 2018); consultant interpreted as erroneous) A p.47
    • vinyl chloride 0.27 µg/L (groundwater, MW8 (off-site), May 2018) A p.47
    • nickel 0.04 to 0.31 mg/L (groundwater, off-site bores at Graham Road (range)) A p.47
    • zinc 0.008 to 0.52 mg/L (groundwater, off-site bores at Graham Road (range)) A p.47
    • lead <0.001 to 0.026 mg/L (groundwater, off-site bores at Graham Road (range)) A p.47
  • Vapour findings (Part A):
    • volatile contaminant concentrations very low; passive soil vapour assessment on adjacent Grassy Woodland audit area indicates negligible soil vapour risk A p.72
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008004128Jack RdWithin 500 m392 m S
  • Register: 53X Statement · 2014-10-02 · 392 m S (audit polygon) · NEARBY
  • Document: Statement (EP Act 1970) · dated 2nd October 2014 · Parts read: C and A · 12 binding conditions, 0 recommendations
  • Coverage: pages read: 2-15, 22, 36, 42-47 of 47 (Part C); pages read: 194-200, 214 of 306 (Part A). Pages not listed were not read; findings on them are not reported.
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant [groundwater] TCE, trichloroeth C p.9; contaminant [groundwater] PCE, tetrachloroeth C p.9; contaminant [groundwater] TCE, trichloroeth C p.9; contaminant [groundwater] dichloroethane C p.9; contaminant [groundwater] dichloroethane C p.9; contaminant [groundwater] dichloroethe C p.9; contaminant [groundwater] vinyl chloride C p.9; contaminant [groundwater] VCH, chlorinated hydrocarbon C p.10
  • Source by contaminant group: petroleum hydrocarbons: unknown C p.9; nutrients: off-site C p.45 scan; PAH: unknown C p.3; asbestos: unknown C p.10 scan; chlorinated solvents: off-site/up-gradient C p.10 scan, site C p.10 scan
  • Outcome:
    • Statement of environmental audit (main site excluding electrical substation): suitable for sensitive (medium to high density), recreational/open space, commercial and industrial uses subject to conditions C p.7
    • Second statement of environmental audit (electrical substation area only): not suitable for any beneficial uses C p.43
  • Suitable for:
    • sensitive (medium to high density), recreational / open space, commercial and industrial land uses C p.7
  • Conditions / recommendations:
    • Condition A: Site must be covered with a physical barrier (building slab, road or paving) in the layout of the development plans (Figure 2A); substantive changes to the development must be accepted by an environmental auditor and advised to EPA and the… C p.7
    • Condition B: Any landscaped area or garden bed must have at least 0.5m thickness of soil below the finished surface, demonstrated suitable for the Site and consistent with IWRG 621 as 'Fill Material'. C p.8
    • Condition C: Surfaces and structures forming the physical barrier, if damaged or removed, must be reinstated as soon as possible to the same condition or better. C p.8
    • Condition D: A vapour mitigation system must be designed by a suitably qualified professional, accepted by an environmental auditor, and installed beneath occupiable buildings and associated basements within the Figure 3A area, with auditor confirmation; may… C p.8
    • Condition E: A continuous, durable marker layer (para-webbing or similar) must be placed at a maximum depth of 0.5 m over the contaminated shallow perched groundwater area (Figure 3A), excluding vapour mitigation areas; may be omitted after remediation with… C p.8
    • Condition F: A Contamination Management Plan (CMP) for the contaminated shallow perched groundwater (Figure 3A) must be developed and accepted by an environmental auditor, covering exposure prevention and extracted groundwater management; may be omitted… C p.8
    • Condition G: No residential occupation or associated use in any part of a stage may commence until Conditions A to F are met and verified in writing by an environmental auditor. C p.8
    • Condition H: Groundwater at the Site is polluted. Groundwater must not be used for any beneficial use without prior testing and review of results by an environmental auditor; may be extracted for monitoring or remediation. C p.9
    • Condition I: Ongoing monitoring and management of groundwater must be implemented as detailed in the attached GQMP (Peraco, J8427-R03, 2 October 2014); may be omitted after remediation of the perched groundwater with auditor approval. C p.9
    • Condition J: It is a condition of this SoEA that all conditions of the GQMP be complied with. C p.9
    • Substation statement Condition B: Groundwater at the Site is polluted. Groundwater must not be used for any beneficial use without prior testing and review of results by an environmental auditor; may be extracted for monitoring or remediation. C p.44
    • Substation statement Condition A: The electrical substation area in the north-east portion of the development (as defined by the attached registered survey, Figure 1B) is not considered suitable for any beneficial use. It may become suitable for sensitive… C p.43
    • Substation statement Condition A (cont.): The environmental auditor's acceptance of the substation area soil conditions must be advised in writing to EPA and the development authority. C p.44
  • Before a certificate (not conditions):
    • i) Clean-up of polluted groundwater such that all beneficial uses of groundwater are restored. C p.9
    • ii) Residual polluted land remaining on-Site is remediated such that all beneficial uses of land are restored, or demonstrated not to pose an unacceptable risk through risk-based assessment. C p.9
    • Substation statement i) Clean-up of polluted groundwater such that all beneficial uses of groundwater are restored. C p.44
    • Substation statement ii) The status of soil beneath the electrical substation is demonstrated to be suitable for the proposed land use. C p.44
  • Contaminants (status, medium, source):
    • TRH C6-C10 | perched groundwater | detected | source: unknown C p.9
    • TRH >C10-C40 | perched groundwater | detected | source: unknown C p.9
    • trichloroethene (TCE) | perched groundwater | detected | source: unknown C p.9
    • tetrachloroethene (PCE) | perched groundwater | detected | source: unknown C p.9
    • trichloroethene (TCE) | groundwater | detected | source: unknown C p.9
    • 1,2 dichloroethane | groundwater | detected | source: unknown C p.9
    • 1,1 dichloroethane | groundwater | detected | source: unknown C p.9
    • 1,1 dichloroethene | groundwater | detected | source: unknown C p.9
    • vinyl chloride | groundwater | detected | source: unknown C p.9
    • volatile chlorinated hydrocarbons | groundwater | detected | source: site C p.10 scan
    • metals and inorganics (aluminium, iron, selenium, arsenic, cobalt, copper, total chromium, lead, manganese, molybdenum, nickel, zinc, fluoride, nitrate, nitrite) and pH | groundwater | detected | source: off-site C p.45 scan
    • B(a)P TEQ | soil | detected | source: unknown C p.3
    • asbestos (bonded asbestos cement fragments) | soil | detected | source: unknown C p.10 scan
  • Groundwater restrictions:
    • Groundwater must not be used for any beneficial use without prior testing and review by an environmental auditor; extraction allowed for monitoring or remediation (Condition H) C p.9
  • Vapour / capping:
    • Physical barrier (building slab, road or paving) over the Site (Condition A) C p.7
    • Vapour mitigation system beneath occupiable buildings and basements in the Figure 3A area (Condition D); 0.5 m clean soil in landscaped areas (Condition B); marker layer over perched groundwater area (Condition E) C p.8
  • Ongoing obligations:
    • Contamination Management Plan (CMP) for contaminated shallow perched groundwater (Condition F) C p.8
    • Groundwater Quality Management Plan (GQMP) ongoing monitoring and management (Conditions I and J) C p.9
    • Owner/occupier must provide a copy of the SoEA and Contaminant Management Plans to any person who becomes or proposes to become an occupier (s53ZE) C p.10 scan
  • Other duties:
    • Auditor determined groundwater cleaned up to the extent practicable and recommended the Site be designated a GQRUZ (Figure 4A) C p.9
    • EPA may require periodic reassessment of the practicability of groundwater clean-up (Clause 19(3) SEPP GoV) C p.9
    • If double level basements are proposed, the need for vapour mitigation must be assessed by an EPA appointed auditor and communicated to EPA and planning authority C p.10 scan
    • Excavated soil/rock disposed off-Site must be classified and managed per regulations and EPA guidelines (IWRG 621); imported fill must be tested and classify as fill material C p.10 scan
    • Groundwater monitoring bores not required by the GQMP should be decommissioned per Minimum Construction Requirements for Water Bores in Australia C p.10 scan
    • Substation statement: where the substation area is assessed as suitable, an addendum to this Statement should be issued by an EPA appointed auditor C p.44
  • Off-site findings:
    • Upgradient off-site sources contribute to volatile chlorinated hydrocarbon contamination of groundwater beneath the Site (Site is a co-source) C p.10 scan
    • Groundwater plume zone of influence approximately 50m from east, 120m from west and 2m from southern site boundaries; undetermined at northern boundary due to upgradient co-sources C p.5
    • also: not stated
  • Plume extent (Part A): not stated
  • Plume direction (Part A): not stated
  • Groundwater flow:
    • South/south-west C p.5
    • also: not stated
  • Key concentrations (Part A):
    • 1,1-dichloroethane 1,500 µg/L (groundwater, MW13 (split sample, 24/04/2014)) vs 27 µg/L A p.198
    • 1,1-dichloroethene 280 µg/L (groundwater, MW13 (field duplicate, 24/04/2014)) vs 30 µg/L A p.198
    • Vinyl chloride (SIM) 0.0031 mg/L (groundwater, MW13 (22/05/2014)) A p.198
    • 1,1-dichloroethane 24 µg/L (groundwater, MW18 (21/05/2014)) vs 27 µg/L A p.199
  • Vapour findings (Part A): not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008005452Graham RdWithin 500 m448 m N
  • Register: 53X Certificate · 2018-06-29 · 448 m N (audit polygon) · NEARBY
  • Document: Certificate (EP Act 1970) · dated 29/06/2018 · Part read: C · 0 binding conditions, 0 recommendations
  • Coverage: pages read: 1-6 of 6 (Part C) (complete)
  • Register documents: Parts C, A and B; read: C
  • Source by contaminant group: salinity/major ions: regional (natural/background) C p.2; metals/metalloids: regional (natural/background) C p.2; asbestos: site C p.3 scan
  • Outcome:
    • Certificate of environmental audit: site neither detrimental nor potentially detrimental to any beneficial use C p.2
    • Certificate of Environmental Audit C p.5
  • Suitable for:
    • any beneficial use of the site C p.2
  • Conditions / recommendations:
  • Contaminants (status, medium, source):
    • TDS | groundwater | detected | source: natural C p.2
    • pH | groundwater | detected | source: natural C p.2
    • sodium | groundwater | detected | source: natural C p.2
    • copper | groundwater | detected | source: natural C p.2
    • nickel | groundwater | detected | source: natural C p.2
    • vanadium | groundwater | detected | source: natural C p.2
    • zinc | groundwater | detected | source: natural C p.2
    • asbestos containing materials (ACM) | soil | detected | source: site C p.3 scan
  • Groundwater restrictions:
    • No protected beneficial uses of groundwater precluded due to pollution C p.5
  • Ongoing obligations:
    • Further works or requirements: None C p.5
  • Other duties:
    • Other related information i: elevated TDS, pH, sodium and metals in groundwater considered natural/background; not pollution under clause 10(2)(c) of SEPP (Groundwaters of Victoria) C p.2
    • Other related information ii: The existing groundwater wells present at the site should be appropriately decommissioned in accordance with relevant guidelines. C p.2
    • Other related information iii: scattered building debris, minor rubbish and driveway gravel do not constitute pollution or represent a health, ecological or aesthetic risk C p.3 scan
    • Other related information iv: If encountered during use of the site, any ACM should be handled and disposed in accordance with the relevant regulations. C p.3 scan
    • Other related information v: soil pH, sulphate and chloride indicate non-aggressive exposure for steel and concrete; cognisance should be given to AS2159 (2009) exposure classifications for piles C p.3 scan
    • Other related information vi: soil pH relatively alkaline in some areas, considered natural; possible impact on some introduced plants, grasses and fauna C p.3 scan
    • Other related information vii: The site has been assessed, assuming that home-grown produce comprises <10% of household fruit and vegetable intake and no poultry. C p.3 scan
    • Other related information viii: Any soil material proposed to be removed from site and disposed off-site must be classified and managed in accordance with relevant statutory regulations and EPA guidelines. C p.3 scan
    • Other related information ix: Any fill or soil imported to the site must be chemically tested soil or fill that classifies as 'fill material' in accordance with relevant EPA guidelines. C p.3 scan
    • Other related information x: Not all land uses for which the land is considered suitable by this audit may be allowed under the existing zoning of the Bayside City Council Planning Scheme. C p.3 scan
  • Off-site findings: not stated
  • Groundwater flow:
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008006101Nepean HwyWithin 500 m456 m NE
  • Register: 53X Statement · 2021-12-07 · 456 m NE (audit polygon) · NEARBY
  • Document: Statement (EP Act 1970) · dated 07 December 2021 · Parts read: C and A · 7 binding conditions, 0 recommendations
  • Coverage: pages read: 1-12 of 12 (Part C) (complete); pages read: 33-34, 41-42, 53, 55, 63, 68 of 74 (Part A). Pages not listed were not read; findings on them are not reported.
  • Register documents: Parts C, A and B; read: C and A
  • Source by contaminant group: cyanide/phenols: unknown C p.4; nutrients: regional C p.4; salinity/major ions: unknown C p.4; metals/metalloids: regional C p.4; petroleum hydrocarbons: unknown C p.4; PAH: unknown C p.4; other: unknown C p.4
  • Document changes (inferred from the reading notes): Former Highett Gasworks Stage 2A; CUTEP and GQRUZ (2010) remain valid; GQMP monitoring to cease. Page 68 is the SoEA (not a certificate) and supersede A p.68
  • Outcome:
    • Statement of environmental audit: site suitable for listed beneficial uses subject to conditions C p.2
    • Certificate of Environmental Audit not issued; condition of the site is detrimental or potentially detrimental to beneficial uses C p.3
  • Suitable for:
    • Sensitive use (High density: residential use, a childcare centre, pre-school or primary school) C p.2
    • Recreation/Open space C p.2
    • Commercial C p.2
    • Industrial C p.2
  • Conditions / recommendations:
    • Condition 1: Statement is referrable to the layout and construction in the attached Masterplan (Apartment and Townhouse Scheme Nepean Highway Highett Gasworks, 14/02/2020); substantive changes (paved area, building footprint, basements) must be… C p.3
    • Condition 2: Groundwater at the site is polluted and not suitable for water dependent ecosystems and species, potable water supply, agriculture and irrigation, primary contact recreation, Traditional Owner cultural values, cultural and spiritual values,… C p.3
    • Condition 3: No basements in proposed plans; site not suitable for a basement without further assessment and potential mitigation for vapour and odour risks; if a basement is incorporated, an environmental audit under the 2017 Act must be conducted. C p.3
    • Condition 4: A Construction Environmental Management Plan must be developed by a suitably qualified professional and verified by an environmental auditor, with verification advised in writing to EPA and the planning authority. C p.3
    • Condition 5: Prior to the commencement of site construction, the owner of the site must implement and maintain a Construction Environmental Management Plan required by condition 4 of this statement. C p.3
    • Condition 6: The existing Site Environmental Management Plan (Stages 2 and 2A) must be revised by a suitably qualified professional to reflect current site conditions and verified by an environmental auditor, with verification advised in writing to EPA and… C p.3
    • Condition 7: Prior to site occupation, the owner of the site must implement and maintain the revised Site Environmental Management Plan required by condition 6 of this statement. C p.3
  • Before a certificate (not conditions):
    • Removal of all residual soil impacts at the site C p.3
    • Restoration of all relevant beneficial uses of groundwater C p.3
  • Contaminants (status, medium, source):
    • cyanide | groundwater | detected | source: unknown C p.4
    • ammonia | groundwater | detected | source: unknown C p.4
    • sulphate | groundwater | detected | source: unknown C p.4
    • metals | groundwater | detected | source: unknown C p.4
    • TRH | groundwater | detected | source: unknown C p.4
    • PAHs (including BTEX) | groundwater | detected | source: unknown C p.4
    • phenols | groundwater | detected | source: unknown C p.4
    • MAHs | groundwater | detected | source: unknown C p.4
    • arsenic | groundwater | detected | source: regional C p.4
    • nickel | groundwater | detected | source: regional C p.4
    • zinc | groundwater | detected | source: regional C p.4
    • nitrate | groundwater | detected | source: regional C p.4
    • also: not stated (chlorinated solvents), not stated (residual soil impacts (substances not named in packet))
  • Groundwater restrictions:
    • Groundwater not suitable for water dependent ecosystems and species, potable water supply, agriculture and irrigation, primary contact recreation, Traditional Owner cultural values, cultural and spiritual values, buildings and structures; not to be used for… C p.3
    • Stages 2 and 2A are a groundwater quality restricted use zone (GQRUZ); 2010 EPA CUTEP determination remains valid C p.4
  • Vapour / capping:
    • Site not suitable for a basement without further assessment and potential mitigation measures to manage vapour and odour risks C p.3
  • Ongoing obligations:
    • CEMP: develop, verify by auditor, and implement and maintain from commencement of construction (Conditions 4 and 5) C p.3
    • Site Environmental Management Plan (Stages 2 and 2A): revise, verify by auditor, and implement and maintain from site occupation (Conditions 6 and 7) C p.3
  • Other duties:
    • Authority may require periodic reassessment of the practicability of groundwater clean up (clause 19(3) SEPP (Groundwaters of Victoria)) C p.4
    • Some soil and groundwater may contain odours; not considered a health or ecological risk but may cause noticeable odour if exposed during excavation, development or occupation C p.4
    • No further groundwater monitoring across Stages 2 and 2A considered necessary; remaining impacts stable or declining and managed by the GQRUZ C p.4
    • On-site and off-site groundwater monitoring bores should be decommissioned within 12 months of cessation of use C p.4
  • Off-site findings:
    • Elevated arsenic, nickel, zinc and nitrate in site groundwater associated with off-site regional sources; not sourced from the site C p.4
    • Off-site groundwater impacts beyond the western side of the rail easement (cyanide, ammonia, sulphate); rail easement on the western (down gradient) margin is a buffer; further off-site contamination considered unlikely A p.63
    • Groundwater metals (arsenic, nickel, zinc) and nitrate attributed to off-site regional sources, not sourced from the site A p.68
    • Historical off-site sources: boat retail/repair, screen printers and circuit board manufacture, former Air Force Aeronautical Engineering Support Facility, Commonwealth Aircraft Corporation factory, Lincoln Mills factory A p.41
    • Groundwater receiving environment assumed to be Port Phillip Bay, approximately 3.7km west A p.41
    • Off-site groundwater bores monitored (e.g. six off-site bores in 2013-2017 events; five off-site bores November 2018); no other off-site investigations A p.34
  • Plume extent (Part A):
    • groundwater impacts extend a short distance off-site to the west; impacted soils confined within site boundaries A p.41
    • 2011 Audit identified off-site groundwater impacts beyond the western side of the rail easement (cyanide, ammonia, sulphate); GQRUZ limited to the site itself A p.63
  • Plume direction (Part A):
  • Groundwater flow:
    • West to southwest C p.10
    • Regional groundwater flow toward the west, estimated 0.37 - 3.7 m/year; western site margin is down gradient A p.63
  • Key concentrations (Part A): not stated (numerical concentrations of groundwater/soil contaminants of concern)
  • Vapour findings (Part A):
    • Auditor evaluated groundwater vapour intrusion risk: benzene at BH6 and TRH F2 (>C10-C16 minus naphthalene) at 9150003, BH6 and BHF35 in the 2018 GME exceeded HSL A/B (residential, sand); no measured values given on this page; conclusion not in packet A p.53
    • Residual soil TRH(C10-C16) and naphthalene exceed ACUT in four remedial excavations near the western boundary; controls needed; residential use precluded there but area is public open space/gas easement A p.53
  • Amended / withdrawn (stated in document):
    • Supersedes the SoEA issued by the auditor of Parsons Brinckerhoff (CARMS 37308-2, Ref 2125064A-A, dated 15 December 2011) C p.4
  • Withdrawn/amended: inferred signals: none found
0008000892Nepean HwyWithin 500 m456 m NE
  • Register: 53X Statement · 2011-12-15 · 456 m NE (audit polygon) · NEARBY
  • Document: Statement (EP Act 1970) · dated Stage 2 statement: 15/12/2011 · Parts read: C and A · 17 binding conditions, 0 recommendations
  • Coverage: pages read: 2-18, 29-30, 85-86 of 87 (Part C); pages read: 109, 132, 166-167, 169, 183-184, 192 of 231 (Part A). Pages not listed were not read; findings on them are not reported.
  • Register documents: Parts C, A and B; read: C and A
  • Source by contaminant group: petroleum hydrocarbons: site C p.86; PAH: site C p.86; cyanide/phenols: site C p.86; metals/metalloids: site C p.86; nutrients: site C p.86; salinity/major ions: site C p.86; other: site C p.4 scan
  • Outcome:
    • Stage 2: Statement of environmental audit (EP Act 1970); site suitable subject to conditions C p.2
    • Stage 2A: Statement of environmental audit (EP Act 1970); site suitable for no beneficial uses (none), subject to conditions C p.8
  • Suitable for:
    • Stage 2: Sensitive use (medium to high density); Commercial; Industrial; Open space C p.2
    • Stage 2A: none C p.8
  • Conditions / recommendations:
    • Stage 2 Condition a): Groundwater is polluted; must not be used for any beneficial use without prior testing and review by an environmental auditor; may be extracted for environmental monitoring or remediation. C p.2
    • Stage 2 Condition b): Prior to 31 January 2012, the auditor-accepted GQMP must be implemented and maintained by the Department of Treasury and Finance and future owners. C p.3
    • Stage 2 Condition c): The GQMP forms part of this Statement of Environmental Audit and must be provided to all future owners/occupiers of the site. C p.3
    • Stage 2 Condition d): GQMP remains in force until an environmental auditor confirms in writing (advised to EPA and planning authority) it is no longer required; a Section 53V audit is the mechanism for cessation. C p.3
    • Stage 2 Condition e): Prior to 29 February 2012, an EMP must be developed by a suitably qualified professional and accepted by an environmental auditor, with acceptance advised in writing to EPA and the planning authority. C p.3
    • Stage 2 Condition f): Prior to 15 March 2012, the Department of Treasury and Finance and future owners of the site must implement and maintain the EMP required by condition (e) of this Statement. C p.3
    • Stage 2 Condition g): Site must be covered with a physical barrier such as 'fill' (consistent with IWRF 621) to a minimum depth of 1m unless beneath building slabs, roads or other concrete structures, specified in the EMP; current condition meets this. C p.3
    • Stage 2 Condition h): Any landscaped area or garden beds must have at least 1m of soil below finished surface, suitable for the site and consistent with IWRF 621 as 'fill', specified in the EMP. C p.3
    • Stage 2 Condition i): Access to residual shallow soil impacts (<1mBGL) near the site boundary (Figure 2) minimised by permanent paving, buildings or at least 1m clean fill; workers excavating along northern, southeastern or southern boundaries made aware and… C p.3
    • Stage 2 Condition j): All physical barriers required by condition (g), if damaged or removed during development or occupation, must be reinstated as soon as possible to the same condition or better. C p.3
    • Stage 2A Condition a): Groundwater is polluted; must not be used for any beneficial use without prior testing and review by an environmental auditor; may be extracted for environmental monitoring or remediation. C p.8
    • Stage 2A Condition b): Prior to 31 January 2012, the auditor-accepted GQMP must be implemented and maintained by the Department of Treasury and Finance and future owners. C p.8
    • Stage 2A Condition c): The GQMP forms part of this Statement of Environmental Audit and must be provided to all future owners/occupiers of the site. C p.9 scan
    • Stage 2A Condition d): GQMP remains in force until an environmental auditor confirms in writing it is no longer required; a Section 53V audit is the mechanism for cessation. C p.9 scan
    • Stage 2A Condition e): Prior to 29 February 2012, an EMP must be developed by a suitably qualified professional and accepted by an environmental auditor, acceptance advised in writing to EPA and planning authority. C p.9 scan
    • Stage 2A Condition f): Prior to 15 March 2012, the Department of Treasury and Finance and future owners of the site must implement and maintain the EMP required by condition (e) of this Statement. C p.9 scan
    • Stage 2A Condition g): No disturbance of soil shall be undertaken prior to the implementation of the EMP. C p.9 scan
  • Before a certificate (not conditions):
    • Stage 2: Remediation of residual groundwater impacts associated with the site to the extent that relevant beneficial uses of groundwater are restored. C p.3
    • Stage 2: Removal of all residual soil impacts below the site. C p.4 scan
    • Stage 2A: Remediation of residual groundwater impacts associated with the site to the extent that relevant beneficial uses of groundwater are restored. C p.9 scan
    • Stage 2A: Removal of all residual soil impacts below the site. C p.9 scan
  • Contaminants (status, medium, source):
    • petroleum hydrocarbons incl. TPH and BTEX (benzene, toluene, ethylbenzene, xylene) | groundwater | detected | source: site C p.86
    • polycyclic aromatic hydrocarbons (PAHs) | groundwater | detected | source: site C p.86
    • total phenols | groundwater | detected | source: site C p.86
    • metals | groundwater | detected | source: site C p.86
    • ammonia | groundwater | detected | source: site C p.86
    • sulphate | groundwater | detected | source: site C p.86
    • free cyanide | groundwater | detected | source: site C p.86
    • residual hydrocarbons (including PAHs) | soil | detected | source: site C p.86
    • lead (inorganics/metals; list truncated in packet) | soil | detected | source: site C p.86
    • sulphate (elevated) and reduced pH | soil | detected | source: unknown C p.4 scan
    • coke, coal, black stained soil | soil | detected | source: site C p.4 scan
  • Groundwater restrictions:
    • Stage 2: groundwater polluted, not suitable for any beneficial use; extract only for environmental monitoring or remediation C p.4 scan
    • Stage 2A: groundwater polluted, not suitable for any beneficial use; extract only for environmental monitoring or remediation C p.9 scan
  • Vapour / capping:
    • Stage 2: physical barrier (fill, min 1m) over site except beneath slabs/roads/concrete; 1m clean soil under landscaping; barriers reinstated if damaged (conditions g, h, j) C p.3
  • Ongoing obligations:
    • Stage 2 and 2A: GQMP implemented by 31 January 2012 and maintained until auditor confirms cessation (s53V audit); provided to future owners/occupiers C p.3
    • Stage 2 and 2A: EMP developed by 29 February 2012 and implemented/maintained from 15 March 2012 C p.3
    • Stage 2: owner/occupier must provide copy of Statement to any person who becomes or proposes to become an occupier (s53Z) C p.4 scan
  • Other duties:
    • Stage 2: EPA determined groundwater cleaned up to the extent practicable (CUTEP) and site is a GQRUZ (Figure 3) C p.4 scan
    • Stage 2A: EPA determined CUTEP and site is a GQRUZ (Figure 3) C p.9 scan
    • Stage 2: Authority may require periodic reassessment of practicability of groundwater clean up (clause 19(3) SEPP GoV) C p.4 scan
    • Stage 2: elevated sulphate and reduced pH in soil and groundwater may impact building footings and subsurface structures C p.4 scan
    • Stage 2: excavated material disposed off site must be classified/managed per regulations and EPA guidelines; imported fill/soil must be chemically tested and classify as 'fill material' C p.4 scan
    • Stage 2A: Authority may require periodic reassessment of practicability of groundwater clean up (clause 19(3) SEPP GoV) C p.9 scan
  • Off-site findings:
    • offsite wells impacted with metals, cyanide, ammonia and sulphate A p.166
    • offsite beneficial uses used or assumed: primary contact recreation, industrial (offsite only), buildings and structures, irrigation A p.166
    • down-gradient property government owned (local and state), including the railway easement A p.169
    • CUTEP determined by EPA November 2010; GQRUZ required over area of polluted groundwater A p.169
    • also: not stated
  • Plume extent (Part A):
    • beyond the western boundary of the site; off-site pollution minimal, mainly elevated ammonia (no distance given) A p.169
    • GQRUZ extent = boundary of the Stage 2 and 2A audit area (Figure 25) A p.169
  • Plume direction (Part A):
    • west (beyond the western site boundary) A p.169
  • Groundwater flow:
    • West to north west towards Port Phillip Bay A p.109
    • local mounding in southern portion of site generates a northerly to north westerly gradient A p.109
    • also: not stated
  • Key concentrations (Part A): not stated (measured groundwater/soil concentrations of contaminants of concern)
  • Vapour findings (Part A):
    • Phase 1 HHRA: two wells (BH9140004, BH6) in NW corner near excavation 189 exceeded site-specific vapour criteria TRH C10-C14 3.5 mg/L and benzene 0.9 mg/L A p.184
    • potential indoor-air vapour risk from naphthalene and benzene in soils at depth (>5 mBGL) in excavations 002, 217, 189 and 210 A p.184
    • Phase 2 soil vapour: several 5 m bores above LOR; RISC model predictions at least 3 orders of magnitude higher than measured soil vapour (conservative) A p.184
    • PAH risk on site driven by vapour (Golder HHRA Feb 2010) A p.167
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found
0008005639Graham RdWithin 500 m481 m N
  • Register: 53X Statement · 2020-02-25 · 481 m N (audit polygon) · NEARBY
  • Document: Statement (EP Act 1970) · dated 25 February 2020 · Parts read: C and A · 7 binding conditions, 0 recommendations
  • Coverage: pages read: 1-11, 22-23 of 112 (Part C); pages read: 71-72, 165, 171, 198-201 of 279 (Part A). Pages not listed were not read; findings on them are not reported.
  • Register documents: Parts C, A and B; read: C and A
  • Chlorinated-solvent rollup (all row types): contaminant [groundwater] vinyl chloride C p.10
  • Source by contaminant group: nutrients: regional C p.10, site C p.10; metals/metalloids: regional C p.10, regional (natural/background) C p.11; petroleum hydrocarbons: regional C p.10; asbestos: site C p.11; salinity/major ions: regional (natural/background) C p.11; chlorinated solvents: site C p.10
  • Outcome:
    • Statement of Environmental Audit (1970 Act): suitable for listed uses subject to conditions; certificate not issued C p.9
  • Suitable for:
    • sensitive use (high and medium density residential including aged care facility) C p.9
    • commercial C p.9
    • industrial C p.9
  • Conditions / recommendations:
    • Condition A: groundwater polluted and not suitable for listed beneficial uses; must not be used for any precluded use without prior testing and review by a suitably qualified professional; may be extracted for monitoring or remediation C p.9
    • Condition B: after the audit, the GQMP (Attachment A, verified by the auditor) must be implemented and maintained by the site owner and/or body corporate C p.9
    • Condition C: the GQMP remains in force until an environmental auditor verifies in writing it is no longer required, accepted by EPA and advised in writing to the planning authority C p.10
    • Condition D: from commencement to completion of construction, the site owner and builder must implement and maintain the ATMA Asbestos Management Plan (21 February 2020, Attachment B) C p.10
    • Condition E: once construction is complete, before occupation and ongoing, the site owner/body corporate must implement and maintain the ATMA Asbestos Management Plan (Attachment B) C p.10
    • Condition F: all physical barriers (per conditions D and E) must be maintained and, if damaged or removed, reinstated as soon as possible to the same condition or better C p.10
    • Condition G: If removal of the physical barriers (as prescribed in condition(s) D and E above) is proposed, an environmental auditor appointed under Part IXD of the Act must be engaged to verify that the barrier is no longer required. C p.10
  • Before a certificate (not conditions):
    • Groundwater is remediated such that all beneficial uses of groundwater are restored at and in the vicinity of the site. C p.10
  • Contaminants (status, medium, source):
    • vinyl chloride | groundwater | detected | source: site C p.10
    • nitrate | groundwater | detected | source: site C p.10
    • total nitrogen | groundwater | detected | source: site C p.10
    • beryllium | groundwater | detected | source: regional C p.10
    • cobalt | groundwater | detected | source: regional C p.10
    • lead | groundwater | detected | source: regional C p.10
    • nitrate (regional component) | groundwater | detected | source: regional C p.10
    • nitrite | groundwater | detected | source: regional C p.10
    • total nitrogen (regional component) | groundwater | detected | source: regional C p.10
    • 1,4-dichlorobenzene | groundwater | detected | source: regional C p.10
    • copper, nickel, zinc, sodium, chloride and sulphate (naturally elevated) | groundwater | detected | source: natural C p.11
    • asbestos containing materials | soil | detected | source: site C p.11
    • bonded asbestos cement (AC) fragments | soil | suspected | source: site C p.11
    • pH (naturally elevated) | soil | detected | source: natural C p.11
  • Groundwater restrictions:
    • Groundwater must not be used for any precluded beneficial use without prior testing and review by a suitably qualified professional (Condition A) C p.9
    • Auditor determined groundwater cleaned up to the extent practicable and site is within a GQRUZ (extent in Attachment C) C p.10
  • Vapour / capping:
    • Physical barriers under the Asbestos Management Plan (conditions D-E) must be maintained, reinstated if damaged, and removed only with auditor verification C p.10
  • Ongoing obligations:
    • GQMP (Attachment A) to be implemented and maintained by the site owner and/or body corporate until auditor verifies it is no longer required C p.9
    • Asbestos Management Plan (ATMA, 21 February 2020, Attachment B) to be implemented and maintained during construction and ongoing after occupation C p.10
  • Other duties:
    • 2) Under Clause 58(4) of the SEPP (Waters) the EPA may require periodic reassessment of the practicability of groundwater clean-up C p.10
    • 6) Groundwater extracted for basement construction or operation must be tested and disposed per EPA Publication 480 and statutory requirements C p.11
    • 7) Groundwater monitoring bores not required for the GQMP should be decommissioned per 'Minimum Construction Requirements for Water Bores in Australia' C p.11
    • 8) AC fragments encountered during future development or use must be handled and disposed in accordance with relevant regulations C p.11
    • 10) Any fill or soil imported must be chemically tested and classify as 'fill material' per EPA guidelines C p.11
    • 11) Soils excavated and disposed off-site must be classified and managed per statutory regulations and EPA guidelines (e.g. IWRG 621) C p.11
    • 12) Under s53ZE the owner/occupier must provide a copy of this Statement to any person who becomes or proposes to become the occupier C p.11
  • Off-site findings:
    • Regional groundwater contaminants (beryllium, cobalt, lead, nitrate, nitrite, total nitrogen, 1,4-dichlorobenzene) not derived from the site C p.10
    • Asbestos remains immediately off-site on the northern and north-western boundary from a former shared asbestos fence; barrier installed to prevent re-contamination C p.4
    • Public toilet block adjacent to the north-east corner of the site is the likely off-site source of metals pollution (Ba, Be, Co, Pb) in MW3 and MW3a, immediately down-hydraulic gradient A p.71
    • Cobalt and lead on and off-site (excluding MW3/MW3a) within ranges of off-site upgradient wells and surrounding audits; regionally occurring/off-site source, not from the site A p.71
    • Beneficial uses precluded on and off-site by zinc; maximum 520 ug/L in off-site up-gradient well MWB; zinc and nickel considered naturally occurring A p.72
  • Plume extent (Part A):
    • Metals pollution (barium, beryllium, cobalt, lead) from an off-site toilet block affects groundwater in the north-eastern portion of the site (wells MW3, MW3a) A p.71
  • Plume direction (Part A): not stated
  • Groundwater flow:
    • West to southwest C p.6
    • South-Westerly A p.171
    • North-eastern side of the site (MW3/MW3a) is the up-hydraulic gradient side A p.71
  • Key concentrations (Part A):
    • Nickel 310 ug/L (groundwater, MW7 (on-site, April 2018)) A p.72
    • Zinc 520 ug/L (groundwater, MWB (off-site up-gradient, May 2018)) A p.72
    • Copper 83 ug/L (groundwater, MW5A (on-site, October 2018)) A p.72
    • Cobalt 34 - 47 ug/L (groundwater, MW3 and MW3a) A p.71
    • Lead 8 - 31 ug/L (groundwater, MW3 and MW3a) A p.71
    • Barium 290 - 890 ug/L (groundwater, MW3 and MW3a (on-site upgradient)) A p.71
  • Vapour findings (Part A): not stated
  • Amended / withdrawn (stated in document): not stated
  • Withdrawn/amended: inferred signals: none found

Bulk layer: suburb solvent screen

Every land audit in Moorabbin, Braeside, Highett and 8 adjacent suburbs, read in one unattended run. The map and table show the 30 audits that report chlorinated solvents in groundwater. Click a strength or source label to see the quote behind it.

169audits in scope
166read (3 could not be read)
80groundwater contamination
30chlorinated solvents in groundwater
56off-site impact

Strength

Source

Grey dots: screened audits with no chlorinated finding in groundwater. Positions are EPA register points; one misplaced point is not drawn.

"Below criteria" needs a quote saying so. No audit in this set has one, so none show that label.

AuditWhereYearStrengthSourceContextCompounds

Street names only in this public demo. The full screen gives the register address and one CSV row per audit.

How much to trust this

The checks below were done by independent AI reviewers against the source PDFs, one acting as a contaminated-land consultant and one as a developer's due-diligence lead. No human audit yet: no consultant or auditor has checked these reports.

20/20fields correct in the final consultant round
40/40fields correct in the final due-diligence round
0invented conditions
  • 2 blind pilots of 10 addresses each. The reviewer picked the addresses.
  • Every finding links to its source page, so a consultant can verify each one in seconds.
  • Full-read check: the statement or summary pages and Part A findings and conclusions of all 6 audits the register places on these three parcels were read page by page. Of 25 summary claims checked, 17 held as written and 8 needed a correction or caveat, now shown above. The largest: the 2024 statement mapped over 328 Bay Rd names the lot next door.

Known limits

  • Register points and parcels. Some audits are a point, not a boundary. Matching uses distance and the address or title stated in the document, and conflicts are shown (see 328 Bay Rd).
  • Long documents are partly read. For every audit on the parcel, all statement pages and the Part A findings and conclusions are read. Other pages of long reports are not. Each report shows "pages read X of Y".
  • The register map can be wrong. At 328 Bay Rd the register maps a 2024 statement over the parcel, but the statement names the lot next door. The report shows both.

What a pilot looks like

You choose the sites. You get the same one-screen report as above for each one, with per-audit detail, page links and "pages read X of Y" for every document.

Free sample

Any 3 publicly audited sites you choose.

Then A$149 per report

Or a flat monthly fee for small firms (from A$300/month).

Full read on request

Every page of any document, delivered within 24 hours.

Reply to the email this link came in.

What this does not do

  • No historical titles, aerial photographs, business directories or site walkover.
  • It does not replace a preliminary site investigation (PSI).
  • The consultant signs off. The report helps you read the EPA register and is not advice.